Laserfiche WebLink
Section II: Plan and Equipment Questionnaire <br />1. Plan or layout for performing proposed work: <br />The proposed jobsite was inspected by one of our Contract Managers during the pre - <br />bid or prior to the bid submittal. During a jobsite visit, attention is directed to the <br />existing conditions and site access. Bowen Engineering Corporation will provide <br />additional information upon request. <br />We intend to construct the job as follows: <br />1. Mobilize <br />2. Construct the Detention Tank <br />3. Construct Pump Building on top of Detention Tank <br />4. Construct the Final Chlorination Vault <br />S. Site Work <br />a. UG Electrical Duct Banks <br />b. UG Piping <br />6. Water Treatment Plant <br />a. Piping Modifications <br />b. Install Chemical Feed Upgrades <br />c. Install HVAC Modifications <br />d. Concrete Repairs <br />7. Once Process Equipment has been delivered <br />a. Well 4A Upgrades <br />b. Well 5 Upgrades <br />c. High Service Pump Installation <br />d. Chemical Feed Upgrades <br />8. Electrical & Mechanical Completion <br />9. Startup <br />10. Final restoration <br />BOWEN <br />