Laserfiche WebLink
b. Lien waivers must be received with regard to all workmanship and materials used in <br />connection with these improvements. <br />c. The Final Dedication must be furnished to Owner by the South Bend, Indiana Board of <br />Public Works. <br />d. Owner must provide copies of test reports or cut sheets on all materials supplied. <br />e. Owner must provide all tests required by City of South Bend Construction Standards and <br />Specifications or other governing bodies. Owner must provide fire flow test data on new <br />hydrants. <br />f. Owner must provide As -Built drawings in accordance with the City of South Bend <br />Prevailing Specifications for Public Works, which may be found at <br />https: / / southbendin.gov/wp-content/uploads /2020/05/Prevailing-Supplemental- <br />Specifications.pdf <br />Owner's failure to comply with this Section 9 shall be a material breach of this Agreement. <br />10. System Development Charges <br />. ee...... e!nse�s�sress .. �i�sss!�ls�ire!�esm iers�sse!� <br />I�TI•.S�Iil9!!l�l.i—. l.ilyA9/l!l��l�� -I..T�.I .14.I.i\�Iwsgi[l <br />e <br />r•Llf \ f�LT_'• <br />[K.!!\%lA�l��/��5.7'It•��A]!L�1�1����I �'!t•t•� �R![�14 %��\�J .� <br />UK I 1 / <br />