My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Main Extension Agreement - Pointe Development Proj No DP21-022 - Riverwalk LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Water Main Extension Agreement - Pointe Development Proj No DP21-022 - Riverwalk LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 3:59:23 PM
Creation date
4/8/2025 2:22:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/8/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and inspection costs in connection with the Dedicated Improvements shall be borne by <br />the Owner. <br />3. Construction Inspection <br />The Owner has provided the City with Exhibit A, which depicts drawings of the <br />Dedicated Improvements, which the City acknowledges conforms to the City's standards. <br />The Owner shall allow the City to inspect the Dedicated Improvements during <br />construction to ensure conformance to the agreed standards set forth in Exhibit A, in <br />particular with regard to zoning requirements, adequacy of design, and quality of <br />construction. The Owner shall contact the City's Engineering Department at least two <br />(2) business days in advance to arrange for the attendance of a City inspector at key <br />milestones throughout work. Key milestones may include but not limited to: hydrostatic <br />testing, bacteria testing, and water main taps. The Owner agrees to perform any necessary <br />adjustments as reasonably requested by the City to ensure the Dedicated Improvements are <br />constructed in accordance with Exhibit A. <br />4. Permits <br />It shall be Owner's sole responsibility and expense to obtain any and all permits <br />associated with the construction and installation of the Dedicated Improvements and to <br />comply with all applicable laws. <br />5. Engineer's Estimate <br />The Owner has provided an Engineer's Estimate (See Exhibit B, incorporated <br />herein by reference and attachment) for the cost to construct the Dedicated Improvements, <br />
The URL can be used to link to this page
Your browser does not support the video tag.