My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - 2025 CCMG Project No 125-004 - VS Engineering Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - 2025 CCMG Project No 125-004 - VS Engineering Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:37:36 PM
Creation date
3/25/2025 12:37:12 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/25/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Name:Riverside, Old US 31, Local HMA <br />Client:City of South Bend <br />Des. No.:0 <br />RFP No.:0 <br />VS Project No.:2505743 <br /> TOTAL TOTAL <br />TASK DESCRIPTION HOURS DOLLARS <br /> / TASK / TASK <br />LABOR-Riverside <br />Verify Topographic Survey Data 2025 0 1 0 4 0 0 5 $700.93 <br />Perform ADA Compliance Check and Identify Potential <br />Locations of Technical Infeasibility 2025 0 1 0 4 0 0 5 $700.93 <br />Review existing Structures and Identify Locations of Poor <br />Drainage 2025 8 0 0 8 0 0 16 $2,828.64 <br />Prepare Title Sheet, Index, General Notes, Utility <br />Information 2025 0 1 0 1 0 1 3 $446.19 <br />Prepare Typical Sections 2025 0 1 0 2 0 4 7 $1,000.77 <br />Plan and Profile Sheets (5)2025 5 10 0 40 0 80 135 $19,389.80 <br />Structure Repair / Replacement Details / Tables 2025 2 4 0 12 0 4 22 $3,283.20 <br />ADA Ramp Design (2 ramps)2025 0 2 0 8 0 12 22 $3,092.66 <br />MOT 2025 1 2 0 8 0 16 27 $3,877.96 <br />Pedestrian MOT Route(s)2025 1 2 0 4 0 4 11 $1,659.64 <br />Quantities 2025 0 2 0 8 0 0 10 $1,401.86 <br />Cost Estimate 2025 0 1 0 4 0 0 5 $700.93 <br />Specifications / Contract Book 2025 0 2 0 12 0 0 14 $1,929.38 <br />Preliminary Plotting <br />Pre-Final Plans (90%) <br /> - Road Design <br />STAFF HOURS BY CLASSIFICATION <br />Rate <br />Year PM II PM I ENG III ENG II ENG I CAD TECH III
The URL can be used to link to this page
Your browser does not support the video tag.