Laserfiche WebLink
Project Name:Riverside, Old US 31, Local HMA <br />Client:City of South Bend <br />Des. No.:0 <br />RFP No.:0 <br />VS Project No.:2505743 <br /> TOTAL TOTAL <br />TASK DESCRIPTION HOURS DOLLARS <br /> / TASK / TASK <br />LABOR - Riverside <br />Research <br />Auditor / Assessor Maps 2025 0 $0.00 <br />Subdivision Plats 2025 0 $0.00 <br />Deeds 2025 0 $0.00 <br />Section Corner Ties 2025 0 $0.00 <br />Plans 2025 0 $0.00 <br />Surveys 2025 0 $0.00 <br />Utility Coordination <br />Locate Tickets 2025 0 0 1 1 $91.00 <br />Follow - Up Verification 2025 2 0 0 2 $394.66 <br />Primary Control <br />Bench Level Circuit 2025 2 8 8 18 $2,119.86 <br />Horizontal Control 2025 1 6 6 13 $1,491.23 <br />Section Corner & Alignment Recon 2025 0 $0.00 <br />Property Corner Reconnaissance 2025 0 $0.00 <br />Topography / Elevations <br />Data Collection 2025 1 16 16 33 $3,647.73 <br />Misc. Details 2025 1 4 4 9 $1,059.93 <br />Route Survey & Field Book Preparation <br />Property Line Determination 2025 0 $0.00 <br />Topography (CAD Drawing)2025 2 0 12 14 $1,486.66 <br />Field Check 2025 0 4 4 8 $862.60 <br />Survey 2025 2 0 8 10 $1,122.66 <br />Travel <br />Travel Time 2025 0 0 0 0 $0.00 <br />0 <br />0 <br />Total Hours ECI 11 38 59 0 0 0 0 0 108 $12,276.33 <br />Average Hourly Rate (2025)$197.33 $124.65 $91.00 <br />Average Hourly Rate (2026)3.9%$205.03 $129.51 $94.55 <br />Topographic Survey <br />STAFF HOURS BY CLASSIFICATION <br />Rate <br />Year <br />Project <br />Surveyor II Party Chief Survey <br />Technician I