Laserfiche WebLink
City of South Bend Project No. 123-022 11/12/2024 <br />2023 Concrete Repairs <br />Line Item Qty Unit Price Total <br />Additional Sidewalk Removal/Replacement 433 SY $135.00 $58,423.95 <br />Additional Curb Ramp Removal/Replacement 117.1 SY $540.00 $63,243.80 <br />Additional Curb Removal/Replacement 690 LFT $56.30 $38,847.00 <br />Bellewood Chemical Subgrade Treatment 1 LS $57,190.00 $57,190.00 <br />Additional Utility Pot Holes 1 Various $23,595.00 $23,595.00 <br />Additional MH Adjustments 5 EA $1,200.00 $6,000.00 <br />Final Quantity Adjustment 1 Various $16,933.61 $16,933.61 <br />CO Total =$264,233.36 <br />Other: Underruns and overruns on various line items. <br />Change Order #3 <br />Notes <br />Scope: Additional MH found requiring elevation adjustments. <br />Scope: Existing curb needed replaced in several areas. <br />Unforeseen: Existing subgrade contains clay; needed chemical treatment <br />to stabilze. <br />Other: Additional pot holing required to verfiy gas services. <br />Scope: Added removals and replacements to fix existing ADA issues (out <br />of compliance).