IAIA Document G701' -2017 <br />Change Order <br />PROJECT: (Name and address) <br />Seitz Park Reconstruction <br />South Bend, Indiana <br />OWNER: (Name a11d address) <br />Board of Public Works <br />City of South Bend, Indiana <br />227 West Jefferson Boulevard <br />South Bend, IN 46601 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />CONTRACT INFORMATION: <br />Contract For: General Construction <br />Date: December 17, 2020 <br />ARCHITECT: (Name and address) <br />Smith Group, Inc. <br />CHANGE ORDER INFORMATION: <br />Change Order Number: 11 <br />Date: March 18, 2025 <br />CONTRACTOR: (Name a11d address) <br />Ziolkowski Construction, Inc. <br />4050 Ralph Jones Drive <br />South Bend, IN 46628 <br />(Insert a detailed descriptio11 of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments <br />attributable to executed Construction Cha11ge Directives.) <br />The Change Order incorporates extra work and design changes in Divisions A, B, C, D, E The extra Costs are described and <br />priced in Ziolkowski Construction's Request for Change Orders RCO's #032R2 and 059 that are additional work changes <br />required to complete the project. <br />RCO 032R2-Schedule extension for River Wall Repairs - <br />RCO 059-Adjust over/under quantities post Change Order# I 0 <br />Liquidated Damages for project equal Zero Dollars <br />The total cost is $4,264.68. (New Line Item D-101) <br />The original Contract Sum was <br />The net change by previously authorized Change Orders <br />The Contract Sum prior to this Change Order was <br />ADD S 185,0000 <br />Deduct S (180,735.32) <br />0.00 <br />The Contract Sum will be increased by this Change Order in the amount of <br />The new Contract Sum including this Change Order will be <br />The Contract Time will be increased by 415 days. <br />The new date of Substantial Completion will be September 27, 2024 <br />$ -7,138.405.35 <br />$ -3,093,234.45 <br />$ 10,231,659.80 <br />$ 4,264.68 <br />$ 10.235,924.48 <br />NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract <br />Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br />Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />ARCHITECT (Firm name) <br />SIGNATURE <br />PRINTED NAME AND TITLE <br />DATE <br />Ziolkowski Construction, Inc. <br />C <br />Robert Bash, Project Manager <br />PRINTED NAME AND TITLE <br />March 18, 2025 <br />DATE <br />City of South Bend, Indiana <br />Board of Public Works <br />OWNER (Firm name) <br />SIGNATURE <br />PRINTED NAME AND TITLE <br />DATE <br />AtA 0ocument G701 -2017. Copyright© 1979, 1987, 2000, 2001 and 2017. AO rights reserved. "The American Institute of Architects," "American Institute of <br />Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 14:25:12 <br />ET on 09/13/2024 under Order No.4104243604 which expires on 12/31/2024, is not for resale, is licensed for one-time use only, and may only be used in 1 accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (389ADA3C) <br />March 25, 2025