My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#2863- Deed; RELEASE OF EASEMENT US 31 Industrial Park Lot 13 South Lot Line
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
Historical Deeds (Warranty/Quit-Claim/Dedications)
>
#2863- Deed; RELEASE OF EASEMENT US 31 Industrial Park Lot 13 South Lot Line
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 2:47:40 PM
Creation date
3/20/2025 2:46:04 PM
Metadata
Fields
Template:
Board of Public Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
T H E A B O N M A R C H E G R O U P <br />750 Lincoln Way East, South Bend, IN 46601 • T 574.232.8700 F 574.251 A440 E msh@abonmcrche.com <br />January22, 2003 <br />City of South Bend <br />Department of Public Works <br />1316 County -City Building <br />South Bend, Indiana 46601 <br />ATTN. Angie Jacobs <br />Fort Wayne, IN <br />Indianapolis, IN <br />Benton Harbor, MI <br />Grand Haven, Mt <br />Manistee, MI <br />Portage, MI <br />St. Clair, MI <br />RE: Release of Easement on/along U.S. 31 industrial Park, Sections Two and Four, First Replat, Lot <br />13A South Lot Line <br />Dear Ms. Jacobs, <br />Please accept this letter as our firm's written request, on behalf of our client, City of South Bend, to request an <br />easement release of the previously platted 30' Drainage and Utility Easement along the south lot line of the <br />above referenced lot. The area of inquiry lies within said recorded subdivision (U.S. 31 Industrial Park, Sections <br />Two and Four, First Replat, recorded under instrument number 0234130). <br />We do not believe that the City has any utility facilities within the existing easement as the easement was newly <br />created this past June. Additionally, no swale or storm water drainage facilities have been constructed within <br />said easement. Please notify our office if the Department of Public Works has any facilities that do exist within <br />the existing easement which would need to be relocated. If utility facilities are within said easement, I will notify <br />our client and inform him that there are costs related to relocating these facilities. <br />We respectfuiiy request written verification that the 30 foot utility and drainage easement be noted as released. <br />If release documents need to be prepared, per your agency's release policy. please notify our office and <br />provide us with a contact person for the release. <br />Thai-,k you fcr your time a,- consideration. If you should have any questions or comments, please do not <br />hesitate to contact me at your earliest convenience. <br />Sincerely, <br />ABONMARCHE CONSULTANTS, LLC <br />tiPPROI ED <br />Board of i ub1:c W or'» <br />Jim Freeman <br />Project Coordinator <br />cc: City of South Bend <br />Community & Economic Development <br />Robert D. Case, Planner <br />Encicsures <br />FA1Projecrs�M2-0474\223 Esmt\PubWrks utiliry esmt release doc <br />Engineers A r c h i l e c t s P l a n n e r s <br />Survayors <br />
The URL can be used to link to this page
Your browser does not support the video tag.