My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 North Lafayette Boulevard_AA 2025-0318
sbend
>
Public
>
Historic Preservation
>
2025
>
April
>
Administrative Approvals
>
607 North Lafayette Boulevard_AA 2025-0318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 10:21:52 AM
Creation date
3/19/2025 10:23:09 AM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
607 North Lafayette Boulevard
HPC Document Type
Certification
HPC Local Historic District
ix. Chapin Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#Services Qty Price Discount Tax Total <br />11 Asphalt Rf(m) - Shingles(Hip/Ridge Cap) <br />(CertainTeed Shadow Ridge) <br />1.00 $0.00 $0.00 No Tax $0.00 <br />Specially designed Shingles to cover Ridge, and Ridge Vent and protect the roof and vent from damage, <br />and water penetration. <br />12 Asphalt Rf(l) - Professional Installation of <br />Complete New Roofing System <br />19.00 $500.00 $0.00 No Tax $9,500.00 <br />This covers installation of up to (3) sheets of decking to replace any rotted wood in the deck. Then laying <br />down ice, and water shield, (90lb) synthetic felt, starter strip, drip edge, and shingles starting from the eves <br />and working our way back to the ridge. Where we will install a ridge vent, with cap to complete your roof if <br />applicable. <br />Followed by a thorough cleanup and disposal of debris. <br />13 Flat Rf(l) - Professional Installation 1.00 $900.00 $0.00 No Tax $900.00 <br />Installation will be done by professional contractors with experience in commercial roof installation. The <br />estimate will include professional installation of ISO Boards that will be staggered to eliminate gaps and <br />allow for better protection and longer life to the roof. <br />EPDM will be installed throughout all the of the flat roof with proper installation of all finishing. This will <br />include all labor, materials, and overhead. <br />14 Dumpster (15yd)1.00 $450.00 $0.00 No Tax $450.00 <br />Cost to load and haul away old materials, installation waste and associated debris for up to (4tons). <br />If the debris goes over on weight it's an extra $40 per ton. <br />Subtotal $11,920.00 <br />Grand Total ($)$11,920.00 <br />Deposit Due $7,152.00 <br />Payment via Check on Mar 17, 2025 (-) $7,152.00 <br />Balance Due $4,768.00 <br />Payment Schedule <br />Deposit (60.00%)$7,152.00 <br />Accepted payment methods <br />Credit Card, Check, Cash, PayPal <br />Message <br />Thank you for supporting your local contractors! <br />Terms
The URL can be used to link to this page
Your browser does not support the video tag.