My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 North Lafayette Boulevard_AA 2025-0318
sbend
>
Public
>
Historic Preservation
>
2025
>
April
>
Administrative Approvals
>
607 North Lafayette Boulevard_AA 2025-0318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 10:21:52 AM
Creation date
3/19/2025 10:23:09 AM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
607 North Lafayette Boulevard
HPC Document Type
Certification
HPC Local Historic District
ix. Chapin Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FROM: <br />Reliable Roofing & Construction <br />License: 5148-23 <br />EIN # 93-4655473 <br />2048 East Ireland Road, Suite A <br />South Bend, IN, 46614 <br />Email: dani@reliableroofingonline.com <br />Phone: (574) 302-7977 <br />INVOICE <br /># INV-001218 <br />Date Issued:Mar 17, 2025 <br />Date Due:Due on Receipt <br />Type:Final Payment <br />Check Payable To:Reliable Roofing & <br />Construction <br />Balance Due:$4,768.00 <br />TO: <br />Cheryl Moody <br />607 North Lafayette Boulevard <br />South Bend, IN, 46601 <br /> <br />JOB LOCATION: <br />Cheryl Moody <br />607 North Lafayette Boulevard <br />South Bend, IN, 46601 <br /> <br />JOB: <br />New Roof <br />#Services Qty Price Discount Tax Total <br />1 Asphalt Rf(l) - Tear off 19.00 $50.00 $0.00 No Tax $950.00 <br />Tearing off includes, setting up the dumpster at a predetermined spot (preferably as close to the working <br />area as possible). Securing the sides of the house, and landscaping with tarps, and OSB/plywood to help <br />contain debri during the tear off and ensure a quick precise cleanup. <br />We then tear down the layer(s) of shingles, felt paper, and ice and water shield down to the decking/wood, <br />and check for rotted wood to be replaced. <br />2 Asphalt Rf(m) - Decking - (OSB/PlyWood)2.00 $60.00 $0.00 No Tax $120.00 <br />Oriented Strand Board(OSB) 7/16" - Is stronger than plywood in shear. Shear values through its thickness, <br />are about 2 times greater than plywood. <br />We install up to (3) boards with each additional board being ($75). In the case of the deck being 1x's we <br />install up to (50ft) before any additional charge. <br />3 Asphalt Rf(m) - Drip Edge 1½" Aluminum 1.00 $0.00 $0.00 No Tax $0.00
The URL can be used to link to this page
Your browser does not support the video tag.