My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1. 1709 E Wayne Street_COA 2025-0213 PACKET
sbend
>
Public
>
Historic Preservation
>
2025
>
March
>
1. 1709 E Wayne Street_COA 2025-0213 PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2025 4:29:13 PM
Creation date
3/11/2025 4:10:54 PM
Metadata
Fields
Template:
South Bend HPC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
904 <br />Marlene Nowak <br />1709 Wayne Street <br />South Bend, IN 46615 <br />Year Built: 1927 <br /> <br /> <br />dba: RENEWAL BY ANDERSEN OF INDIANA, OHIO & TENNESSEE <br />Legal Name: Windows, LLC | License # (null) <br />1320 City Center Dr. Suite 350 | Carmel, IN 46032 <br />Phone: (317) 428-2054 | Fax: (null) | (null) <br />Measure Tech: Richard Challinor, (574)310-5394 <br />904 Addendum <br />Misc <br />Misc: Misc, Job Charge, Other, Quantity 1, H/O modifi ed-⬛ Added hand lifts to all windowsHome Owner understands and <br />accepts:⬛ Windows will be coming with GBG’s and not INTWS⬛ RBA will be removing the storm windows and they will not be <br />able to go back on. ⬛ RBA will be installing White aluminum coil to the exterior. ⬛ That Headliners, Jamb Liners, and <br />Weatherstripping may not be the same color as the interior and or exterior of the windows being replaced.⬛ That there will be <br />glass loss associated with replacement windows. ⬛ Any pictures or breakables around work area should be removed prior to <br />installation. ⬛ To have minimum of 3’ around the interior and exterior of each unit being replaced on install date. ⬛ With the <br />operation and handing of all the windows. ⬛ That H/O will be responsible for any painting/staining to windows, doors, interior <br />trim and or any touch up painting that may need done after install. ⬛ It could be twelve to sixteen weeks for project <br />completion. Construction: None Material: None <br />UNIT NOTES <br />H/O modified- <br />⬛ Added hand lifts to all windows <br />Home Owner understands and accepts: <br />⬛ Windows will be coming with GBG’s and not INTWS <br />⬛ RBA will be removing the storm windows and they will not be able to go back on. <br />⬛ RBA will be installing White aluminum coil to the exterior. <br />⬛ That Headliners, Jamb Liners, and Weatherstripping may not be the same color as the interior and or exterior <br />of the windows being replaced. <br />⬛ That there will be glass loss associated with replacement windows. <br />⬛ Any pictures or breakables around work area should be removed prior to installation. <br />⬛ To have minimum of 3’ around the interior and exterior of each unit being replaced on install date. <br />⬛ With the operation and handing of all the windows. <br />02/13/25 Page 25 / 27
The URL can be used to link to this page
Your browser does not support the video tag.