My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - 2025 Tree Removal Project No. 125-018 - Gallegos Tree Service
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotes - 2025 Tree Removal Project No. 125-018 - Gallegos Tree Service
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2025 12:43:19 PM
Creation date
2/25/2025 12:42:57 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/25/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA! <br />CQNT_RACTOR'S QUOTE FOR PU13LIC WOR#'C <br />rs65 <br />PROJECT NAME: <br />PROJECT NO. <br />QUOTES DUE <br />2025 Tree and Stump Removal <br />125-018 <br />February 25t", 2025 by 9:00am EST. Electronic quotes are to be <br />delivered via email to bpwbids0southbendin.pov. <br />(Must be completed for all quotes. Please type or print)/ <br />Date., J off ' d� -a 0 a 5 Firm: �t i U� l f� Ilepal.... Gv le o r,e Sr tm t ic� <br />Address: <br />City/State/Zip: ICA <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the <br />public works project of. <br />'14' Telephone Number: �j_7 9'/5 <br />undersigned offers to furnish labor and/or material necessary to complete the <br />2025 Tree and Stump Removal <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, Department of Public Works <br />and dated 0)- a)- — a)aS for the sum of (enter the Total Quote as shown on the Proposal) <br />-5 i ie en ! o ds r�,� d Sevea vx di-PV .. 6 Z / lulu fig, l q j (s 1K, 7 5d . Q p <br />(Enter Sum of Total Quote shown on Proposal ' (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any addendurns <br />attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown in <br />the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the itemization <br />of the units shall be shown on a separate attachment. <br />By <br />(Signature) <br />(Printed Ngmeerson Signing) <br />The above quote is accepted this <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Elizabeth A. Maradik, President <br />Gary A. Gilot, Member <br />Murray L. Miller, Member <br />ACCEPTANCE <br />day of <br />Joseph R. Molnar, Vice President <br />Breana N. Micou, Member <br />Attest: Theresa Heffner, Clerk <br />20 <br />Version 9t2912029 Page - 8 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.