My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - 2025 Tree Removal Project No. 125-018 - Ellis Hardwoods
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotes - 2025 Tree Removal Project No. 125-018 - Ellis Hardwoods
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2025 12:42:57 PM
Creation date
2/25/2025 12:42:21 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/25/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. The Contractor shall take diligent care to protect the public, the workers, streets, sidewalks, and <br />adjacent public and private property from the hazards of tree removal and stump removal <br />operations. <br />4. The Contractor shall notify residents in advance of work commencing via door hangers. The <br />Contractor shall submit a letter to the City for approval prior to distributing. <br />5. Trees and stumps to be removed and all their debris shall be completely removed from the <br />site daily. No piles of debris are allowed to sit on site after work is completed daily. No fires or <br />burning will be allowed. The debris shall be removed in accordance with all applicable Federal, <br />State, and local laws and ordinances to a facility licensed to receive such waste. The Contractor <br />shall inform the Engineer of the name of the facility receiving the waste. Items of salvageable value <br />to the Contractor, such as firewood or kindling, must be removed from the site as the work <br />progresses. Storage or sale on the site will not be permitted. The Contractor may choose to sell <br />or provide firewood, kindling, or mulch gratis to the adjacent homeowner or a neighbor. All such <br />salvaged materials must be removed to the receiver's premises as the work progresses in <br />compliance with all laws, statutes, and ordinances regulating such transactions including <br />transportation, zoning, and storage. <br />6. Stumps can be removed either by grinding or by full removal, at the contractor's discretion. Any <br />curb, sidewalk, approach, pavement, lawn, or other feature that is damaged during removals shall <br />be repaired or replaced as necessary at no additional cost to the City or adjacent property owner. <br />7. Stumps and roots within five (5) feet of the stump shall be ground to a depth of at least 18 inches <br />below the existing sidewalk elevation, using suitable stump grinding equipment when in proximity <br />to curb, sidewalk, or approaches. <br />8. The tree and stump removals within this contract correspond with sidewalk replacement being <br />completed in 2025 by the City of South Bend Streets Division. If the contractor intends to remove <br />stumps and roots by full excavation, the contractor must verify with the Streets Division that the <br />adjacent sidewalk is scheduled for replacement. The contractor shall then cut roots at the edge of <br />sidewalk and leave roots underneath sidewalk in place. <br />9. At all removal locations, the contractor shall fill the created hole with B Borrow up to a depth of four <br />(4) inches below grade. The contractor shall then provide four (4) inches of clean, rich topsoil <br />covering the entire disturbed area_ The cost of B Borrow and topsoil will not be paid for separately, <br />but shall be included in the cost of the tree removal or stump removal. <br />10. After placing topsoil, each removal area shall receive mulching. The cost of mulching will not be <br />paid for separately, but shall be included in the cost of the tree removal or stump removal. <br />11. The bid price for removal of any size tree shall include removal of its stump and roots. The cost of <br />stump removal will be incidental to the cost of the tree being removed. Stump removal will only be <br />paid separately for existing stumps in the right-of-way that are not otherwise part of a tree removal. <br />12. Tree diameters shall be confirmed prior to removal. All trees shall be measured with a <br />representative from the City of South Bend Engineering Division on site. The City will not pay for <br />any trees measured and removed without the on -site approval of the Engineer. <br />13. Pay Item Diameters are defined as follows: <br />Measured DBH <br />Pay Diameter <br />0 to 18 in. <br />18 in <br />Over 18 to 24 in. <br />24 in. <br />Over 24 to 36 in. <br />30 in. <br />Over 36 in. to 42 in. <br />36 in. <br />Version 9/2912021 Page - 6 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.