My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 1 Angela Blvd Roadway Improvements Proj No 122-059R - Milestone Contractors LP
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders
>
Change Order No. 1 Angela Blvd Roadway Improvements Proj No 122-059R - Milestone Contractors LP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 12:51:56 PM
Creation date
2/25/2025 12:30:59 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/25/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P,i,Milestone <br />Angela Blvd Roadway Improvements <br />DIVISION 2 <br />(curb & flatwork along north side of Angela Blvd, all within Division 2) <br />Original Unit <br />Pay Item # <br />Item Description <br />Estimated Quantity <br />Unit <br />Bid Price <br />TOTAL <br />10 <br />Curb Ramp, Concrete <br />258 <br />SYS <br />$205.00 <br />$52,890.00 <br />12 <br />Sidewalk, Concrete, 4 in. <br />121 <br />SYS <br />$97.00 <br />$11,737.00 <br />15 <br />Curb & Gutter, Concrete <br />1106 <br />LIFT <br />$104.00 <br />$115,024.00 <br />78 <br />Sidewalk, Concrete, 6 in. <br />493 <br />SYS <br />$103.00 <br />$50,779.00 <br />$230,430.00 <br />1. All four(4) above items & prices were established at Bid Time. <br />2. Above quantities were based on our plan measurements for Curb/Gutter and flatwork along north side of Angela Blvd. <br />NEW Unit <br />New Pay Item <br />Item Description" <br />Estimated Quantity <br />Unit <br />Price <br />TOTAL <br />10ND <br />Curb Ramp, Concrete(7 in.) <br />258 <br />SYS <br />$280.00 <br />$72,240.00 <br />12ND <br />Sidewalk, Concrete(7 in.) <br />121 <br />SYS <br />$155.60 <br />$18,827.60 <br />15ND <br />Curb & Gutter, Concrete <br />1106 <br />LIFT <br />$144.80 <br />$160,148.80 <br />78ND <br />Sidewalk, Concrete(? in.) <br />493 <br />SYS <br />$161.00 <br />$79.373 00 <br />$330,589.40 <br />The NEW Unit Prices above includes the following, mirroring N.D. concrete standards, including; <br />a. Stead & Buff shake on coloring <br />b. UND exterior concrete mix <br />c. Forta fibers and <br />d. Thickness of ALL concrete flatwork reflects seven(7) inch thickness. <br />In Summary, the total estimated ADDITIONAL cost is: $100,159.40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.