Laserfiche WebLink
102 <br />Overstory Tree, 2 1/2 in. Caliper <br />54 <br />EA <br />$650.00 <br />$35,100.00 <br />$665.00 <br />$35,910.00 <br />$779.00 <br />$42,066.00 <br />$779.00 <br />$42,066.00 <br />103 <br />Line, Thermoplastic, Solid, Yellow, 4 in. <br />2244 <br />LFT <br />$1.50 <br />$3,366.00 <br />$0.97 <br />$2,176.68 <br />$1.05 <br />$2,356.20 <br />$1.05 <br />$2,356.20 <br />104 <br />Line, Thermoplastic, Broken, Yellow, 4 in. <br />20 <br />LFT <br />$1.50 <br />$30.00 <br />$1.58 <br />$31.60 <br />$1.05 <br />$21.00 <br />$1.05 <br />$21.00 <br />105 <br />Line, Thermoplastic, Solid, White, 4 in. <br />2162 <br />LFT <br />$1.50 <br />$3,243.00 <br />$0.97 <br />$2,097.14 <br />$1.05 <br />$2,270.10 <br />$1.05 <br />$2,270.10 <br />106 <br />Line, Thermoplastic, Broken, White, 4 in. <br />190 <br />LFT <br />$1.50 <br />$285.00 <br />$1.58 <br />1 $300.20 <br />$1.05 <br />1 $199.50 <br />$1.05 <br />1 $199.50 <br />107 <br />Transverse Marking, Thermoplastic, Stop Line, 24 in. <br />138 <br />LFT <br />$15.00 <br />$2,070.00 <br />$15.14 <br />$2,089.32 <br />$8.95 <br />$1,235.10 <br />$8.95 <br />$1,235.10 <br />108 <br />Transverse Marking, Thermoplastic, Crosswalk Line, White, 6 in. <br />633 <br />LFT <br />$3.00 <br />$1,899.00 <br />$4.75 <br />$3,006.75 <br />$1.25 <br />$791.25 <br />$1.25 <br />$791.25 <br />109 <br />Transverse Marking, Thermoplastic, Crosswalk Line, White, 24 in. <br />360 <br />LFT <br />$19.00 <br />$6,840.00 <br />$13.41 <br />$4,827.60 <br />$8.95 <br />$3,222.00 <br />$8.95 <br />$3,222.00 <br />110 <br />Pavement Message Marking, Thermoplastic, Lane Indication Arrow <br />8 <br />EA <br />$225.00 <br />$1,800.00 <br />$217.00 <br />$1,736.00 <br />$125.00 <br />$1,000.00 <br />$125.00 <br />$1,000.00 <br />111 <br />Line, Thermoplastic, Dotted, Yellow, 4 in., 3 ft. line, 9 ft. Gap <br />138 <br />LFT <br />$2.00 <br />$276.00 <br />$1.47 <br />$202.86 <br />$1.05 <br />$144.90 <br />$1.05 <br />$144.90 <br />112 <br />Line, Thermoplastic, Dotted, White, 4 in., 3 ft. line, 9 ft. Gap <br />30 <br />LFT <br />$2.00 <br />$60.00 <br />$1.47 <br />$44.10 <br />$1.05 <br />$31.50 <br />$1.05 <br />$31.50 <br />113 <br />Transverse Marking, Thermoplastic, Crosshatch Line, Yellow, 12 in. <br />10 <br />LFT <br />$15.00 <br />$150.00 <br />$7.04 <br />$70.40 <br />$4.95 <br />$49.50 <br />$50.00 <br />$500.00 <br />114 <br />Transverse Marking, Thermoplastic, Bike Symbol <br />8 <br />EA <br />$500.00 <br />$4,000.00 <br />$435.00 <br />$3,480.00 <br />$165.00 <br />$1,320.00 <br />$105.00 <br />$840.00 <br />115 <br />Transverse Marking, Thermoplastic, Sharrow <br />1 <br />EA <br />$500.00 <br />$500.00 <br />$327.00 <br />$327.00 <br />$495.00 <br />$495.00 <br />$495.00 <br />$495.00 <br />116 <br />Pavement Message Marking, ADA Accessible Symbol, Blue <br />1 <br />EA <br />$500.00 <br />$500.00 <br />$406.00 <br />$406.00 <br />$495.00 <br />$495.00 <br />$495.00 <br />$495.00 <br />117 <br />Pavement Message Marking, Epoxy, Chevron, White <br />6 <br />EA <br />$500.00 <br />$3,000.00 <br />$877.00 <br />$5,262.00 <br />$395.00 <br />$2,370.00 <br />$395.00 <br />$2,370.00 <br />118 <br />Transverse Marking, Thermoplastic, Solid Green Fill, Full Width <br />98 <br />SYS <br />$20.00 <br />$1,960.00 <br />$88.24 <br />$8,647.52 <br />$121.00 <br />$11,858.00 <br />$121.00 <br />$11,858.00 <br />119 <br />Transverse Marking, Thermoplastic, Yield Line, White, 18 in. <br />30 <br />LFT <br />$20.00 <br />$600.00 <br />$15.44 <br />$463.20 <br />$7.95 <br />$238.50 <br />$10.00 <br />$300.00 <br />120 <br />Grooving for Pavement Markings <br />4616 <br />LFT <br />$1.00 <br />$4,616.00 <br />$0.88 <br />$4,062.08 <br />$0.72 <br />$3,323.52 <br />$1.00 <br />$4,616.00 <br />121 <br />Temporary Pavement Marking, Removable, 4 in. <br />725 <br />LFT <br />$2.00 <br />$1,450.00 <br />$1.37 <br />$993.25 <br />$1.70 <br />$1,232.50 <br />$1.70 <br />$1,232.50 <br />122 <br />Line, Remove <br />2500 <br />LFT <br />$1.00 <br />$2,500.00 <br />$0.77 <br />$1,925.00 <br />$1.30 <br />$3,250.00 <br />$1.30 <br />$3,250.00 <br />123 <br />Sign Post, Square, Type 2, Reinforced Anchor Base <br />91 <br />LFT <br />$15.00 <br />$1,365.00 <br />$29.34 <br />$2,669.94 <br />$29.34 <br />$2,669.94 <br />$15.00 <br />$1,365.00 <br />124 <br />Sodding, Nursery <br />1733 <br />SYS <br />$14.00 <br />$24,262.00 <br />$10.55 <br />$18,283.15 <br />$11.99 <br />$20,778.674Li::�$4,205,61L17 <br />$20,778.67 <br />125 <br />Topsoil <br />194 <br />CYS <br />$95.00 <br />$18,430.00 <br />$84.00 <br />$16,296.00 <br />$84.00 <br />$16,296.00 <br />$16,296.00 <br />BASE BID TOTAL <br />$3,002,841.00 <br />$3,047,000.00 <br />$3,422,273.27 <br />ALTERNATE BID <br />Item No. <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />1 <br />Light Standard, Type C <br />10 <br />EA <br />$9,000.00 <br />$90,000.00 <br />$11,416.68 <br />$114,166.80 <br />$11,416.68 <br />$114,166.80 <br />$12,877.00 <br />$128,770.00 <br />2 <br />Light Standard Foundation <br />10 <br />EA <br />$1,500.00 <br />$15,000.00 <br />$1,026.82 <br />$10,268.20 <br />$1,026.82 <br />$10,268.20 <br />$1,400.00 <br />$14,000.00 <br />3 <br />Electrical Wiring, #4 XHHW <br />7300 <br />LFT <br />$9.00 <br />$65,700.00 <br />$2.14 <br />$15,622.00 <br />$2.14 <br />$15,622.00 <br />$8.30 <br />$60,590.00 <br />4 <br />Electrical Wiring, #6 XHHW <br />7300 <br />LFT <br />$9.00 <br />$65,700.00 <br />$1.72 <br />$12,556.00 <br />$1.72 <br />$12,556.00 <br />$6.80 <br />$49,640.00 <br />5 <br />HDPE Schedule 80 Conduit, 2 in. <br />4900 <br />LFT <br />$15.00 <br />$73,500.00 <br />$7.83 <br />$38,367.00 <br />$7.83 <br />$38,367.00 <br />$18.00 <br />$88,200.00 <br />6 <br />HPDE Schedule 80 Conduit, 3 in. <br />150 <br />LFT <br />$15.00 <br />$2,250.00 <br />$14.21 <br />$2,131.50 <br />$14.21 <br />$2,131.50 <br />$21.00 <br />$3,150.00 <br />7 <br />Electric Service Point, Tesco, Single Meter, Relocate <br />1 <br />EA <br />$5,000.00 <br />$5,000.00 <br />$1,384.95 <br />$1,384.95 <br />$1,384.95 <br />$1,384.95 <br />$10,000.00 <br />$10,000.00 <br />8 <br />Controller Cabinet Foundation, P1 <br />1 <br />EA <br />$2,600.00 <br />$2,600.00 <br />$1,226.56 <br />$1,226.56 <br />$1,226.56 <br />$1,226.561 <br />$1,200.00 <br />$1,200.00 <br />9 <br />Handhole, Lighting <br />1 <br />EA <br />$2,100.00 <br />$2,100.00 <br />$1,833.72 <br />$1,833.72 <br />$1,833.72 <br />$1,833.72 <br />$2,600.00 <br />$2,600.00 <br />ALTERNATE BID TOTAL <br />$321,850.00 <br />$197,556.73 <br />$197,556.73 <br />$358,150.00 <br />ENGINER'S ESTIMATE <br />TOTAL EST $3,324,691.00 <br />MILESTONE BID <br />TOTAL BID $3,244,556.73 <br />REITH-RILEY BID <br />1TOTAL BID $3,619,830.00 <br />HRP BID <br />1TOTAL BID $4,563,806.17 <br />I certify that this bid tab is true and accurate. <br />Nitin V. Timble, PE, PS <br />Project Manager <br />A&Z Engineering, Inc. <br />Responsible for Bid Review <br />V\11Tl# <br />No. <br />-�: 10707587 <br />STATE OF <br />Zz <br />