Laserfiche WebLink
PROJECT NAME: <br />PROJECT NO. <br />FOR BIDS DUE: <br />CONTRACTOR NAME: <br />BASE BID (ADDENDUM NO. 2) <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Mishawaka Avenue Streetscape <br />121-072 <br />February 11, 2025, 9:00am, Local Time <br />Milestone Contractors, L.P. <br />ITEM <br />NO. <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT <br />COST <br />ITEM COST <br />1 <br />Mobilization and Demobilization <br />1 <br />LS <br />289,000.00 <br />$289,000.00 <br />2 <br />Construction Engineering <br />1 <br />LS <br />4,194.00 <br />$4,194.00 <br />3 <br />Maintenance of Traffic <br />1 <br />LS <br />45,000.00 <br />$45,000.00 <br />4 <br />Erosion Control <br />1 <br />LS <br />5,000.00 <br />$5,000.00 <br />5 <br />Clearing Right of Way <br />1 <br />LS <br />139,000.00 <br />$139,000.00 <br />6 <br />Excavation, Common <br />2923 <br />CYS <br />52.00 <br />$151,996.00 <br />7 <br />Borrow <br />257 <br />CYS <br />60.00 <br />$15,420.00 <br />8 <br />Inspection Hole, Greater than 3 ft. <br />6 <br />EA <br />2,000.00 <br />$12,000.00 <br />9 <br />Inspection Hole, Less than 3ft. <br />6 <br />EA <br />1,500.00 <br />$9,000.00 <br />10 <br />Railroad Tie Removal <br />500 <br />LIFT <br />14.00 <br />$7,000.00 <br />11 <br />Concrete, Remove <br />500 <br />SYS <br />15.00 <br />$7,500.00 <br />12 <br />Remove Structure <br />6 <br />EA <br />500.00 <br />$3,000.00 <br />13 <br />Pipe, Type 2, Circular, 12 in. <br />623 <br />LFT <br />52.00 <br />$32,396.00 <br />14 <br />Pipe, Type 2, Circular, 15 in. <br />90 <br />LIFT <br />45.00 <br />$4,050.00 <br />15 <br />Pipe, Type 2, Circular, 21 in. <br />345 <br />LIFT <br />62.00 <br />$21,390.00 <br />16 <br />Pipe, Type 2, Circular, 24 in. <br />576 <br />LIFT <br />78.00 <br />$44,928.00 <br />17 <br />48 in. Type B Manhole <br />7 <br />EA <br />8,300.00 <br />$58,100.00 <br />18 <br />60 in. Saddle Manhole <br />1 <br />EA <br />14,000.00 <br />$14,000.00 <br />19 <br />Core Hole in Structure <br />1 <br />EA <br />2,400.00 <br />$2,400.00 <br />20 <br />Standard Inlet <br />18 <br />EA <br />3,400.00 <br />$61,200.00 <br />21 <br />Adjust Casting to Grade, Manhole <br />12 <br />EA <br />900.00 <br />$10,800.00 <br />22 <br />Adjust Casting to Grade, Inlet <br />6 <br />EA <br />500.00 <br />$3,000.00 <br />23 <br />Adjust Casting to Grade, Valve Box <br />2 <br />EA <br />420.00 <br />$840.00 <br />24 <br />Adjust Casting to Grade, Water Curb Stop <br />6 <br />EA <br />420.00 <br />$2,520.00 <br />25 <br />Adjust Handhole to Grade <br />1 <br />EA <br />342.55 <br />$342.55 <br />26 <br />6 in. Ductile Iron Pipe <br />26 <br />LIFT <br />208.00 <br />$5,408.00 <br />27 <br />8 in. Ductile Iron Pipe <br />208 <br />LIFT <br />88.00 <br />$18,304.00 <br />28 <br />12 in. Ductile Iron Pipe <br />1208 <br />LIFT <br />112.00 <br />$135,296.00 <br />29 <br />8 in. Gate Valve and Box <br />2 <br />EA <br />3,700.00 <br />$7,400.00 <br />