My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Dedicated Improvements Agreement - Supermercado San Miguel-TX Concrete
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Dedicated Improvements Agreement - Supermercado San Miguel-TX Concrete
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 3:55:14 PM
Creation date
2/25/2025 12:26:04 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/25/2025
Text box
ID:
1
Creator:
Created:
2/25/2025 12:26 PM
Modified:
2/25/2025 12:26 PM
Text:
https://southbendin.gov/wp-content/uploads/2018/07/SBN-Spec-Stand-FINAL-062618-REV-2_BPWSignature.pdf
ID:
2
Creator:
Created:
2/25/2025 12:26 PM
Modified:
2/25/2025 12:26 PM
Text:
https://southbendin.gov/wp-content/uploads/2018/07/SBN-Spec-Stand-FINAL-062618-REV-2_BPWSignature.pdf
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6. Term <br />Except as otherwise provided herein, this Agreement shall continue for a period of sixteen <br />(16) months from the Effective Date of this Agreement, or upon the issuance of the relevant <br />occupancy permit(s), whichever occurs last. <br />7. Dedication <br />The Owner understands the dedication of the Dedicated Improvements to the City is a <br />requirement for occupancy. Upon completion of the construction of the Dedicated Improvements, <br />substantially as depicted in Exhibit A, the Owner shall use its best efforts to work with the City to <br />ensure that the Dedicated Improvements are dedicated to the City in a timely manner. It is <br />understood by Owner that no dedication shall be accepted by the City until all required easements <br />have been conveyed, accepted, and recorded by the City. Additionally, prior to dedication, the <br />following must be satisfied: <br />a. All parts and labor must meet the requirements stated in the design specifications as <br />presented to and approved by the City Engineering Department. <br />b. Owner must provide copies of test reports or cut sheets on all materials supplied. <br />c. Owner must provide As -Built drawings in accordance with the City of South Bend <br />Prevailing Specifications for Public Works, which may be found at <br />https:Hsouthbendin.gov/wp-content/uploads/2018/07/SBN-Spec-Stand-FINAL-062618- <br />REV-2_BPWSi ng ature.pdf <br />Owner's failure to comply with this Section 6 shall be a material breach of this Agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.