My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to OEA - Riverfront West Urban Neighborhood - Lochmueller Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 1 to OEA - Riverfront West Urban Neighborhood - Lochmueller Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2025 12:26:03 PM
Creation date
2/25/2025 12:25:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/25/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 8 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />11.2 Review and respond to Contractor questions submitted during bidding and prepare <br />addenda as needed. <br />11.3 Attend pre-bid meeting. <br />11.4 Prepare the Bid Tabulation and Recommendation. <br />11.5 Conduct Pre-Construction Meeting and prepare minutes. <br />11.6 Review and respond to Contractor questions during construction. <br />11.7 Review equipment information sheets, shop drawings, and related information submitted <br />by the Contractor to confirm concurrence with the design intent and applicable standards. <br />11.8 Attend up to twelve (12) construction progress meetings. <br /> <br />12.0 Services Not Being Provided by CONSULTANT <br />The services not being provided by CONSULTANT under this Agreement include, but are not <br />limited to, the following: <br />12.1 Boundary Retracement surveys of the parcels within the project site. <br />12.2 Any subdivision platting and associated fees/meetings for the land transfer and/or <br />roadway vacations within the project area. <br />12.3 Detailed topographic survey data collection of any existing buildings within the project <br />area. <br />12.4 Topographic survey data collection of the existing Post Office parcel within the project <br />area. <br />12.5 Hydraulic modeling of the water distribution system, unless requested <br />12.6 Hydraulic modeling of the sanitary sewer system <br />12.7 Storm water quality and/or green infrastructure design <br />12.8 Fire flow testing <br />12.9 Detention design <br />12.10 Environmental Documentation <br />12.11 Public Involvement <br />12.12 Pavement Design – City of South Bend standards will be used. <br />12.13 Right-of-Way Engineering and Right-of-Way Services <br />12.14 Monitoring of accurate placement of utility relocations. <br />12.15 Daily inspections of utility relocation including material inspections and/or inspection of <br />or Buy America compliance during installation. <br />12.16 Temporary lighting plans are not assumed to be needed as part of this scope of work. <br />12.17 Lighting custom foundation design, geotechnical analysis, or subsurface investigations. <br />12.18 Construction Inspection Services <br /> <br />13.0 Items provided by Owner <br />13.1 All relevant sections of the Downtown South Bend Stormwater Plan including the report <br />narrative, access to the Riverfront West hydrologic and hydraulic model(s), and <br />associated documentation prepared by McCormick Engineering. <br />13.2 Access to Black & Vetch city-wide water model. <br /> <br />14.0 Services resulting from significant changes in the general scope, extent or character of the <br />Project or its design including, but not limited to, changes in size, complexity, CLIENT ’s
The URL can be used to link to this page
Your browser does not support the video tag.