Laserfiche WebLink
Page 1 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />This is EXHIBIT K, consisting of 2 pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated September 12, 2023. AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. 3 1.Background Data:a.Effective Date of Owner-Engineer Agreement:September 12, 2023 b.Owner:City of South Bend c.Engineer: Abonmarche Consultantsd.Project:Downtown South Bend to Notre Dame Trail 2.Description of Modifications: <br />a. The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is modified asfollows:•Revise design and plan sheets of retaining wall between the alley west of St. <br />Louis Boulevard and St. Louis Boulevard <br />•Design and survey of retaining wall along the frontage of 613 South Bend <br />Avenue and wrap around each alley. <br />•Quantities and Specifications for retaining wall and fence <br />•Prepare and submit variance application for wall height and fence height. <br />Prepare and submit application for fence permit <br />b. For the Additional Services or the modifications to services set forth above, <br />Owner shall pay Engineer the following additional or modified compensation: <br />•Survey$1,100 <br />•Retaining Wall from 613 South Bend Ave to 627 South Bend Ave $7,200 <br />•Variances and Fence Permit $3,850 <br />Total increase in contract amount: $12,150