My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#2626- Deed; EASEMENT AGREEMENT Grandview Subdivision
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
Historical Deeds (Warranty/Quit-Claim/Dedications)
>
#2626- Deed; EASEMENT AGREEMENT Grandview Subdivision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2025 2:13:33 PM
Creation date
2/13/2025 2:12:55 PM
Metadata
Fields
Template:
Board of Public Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-2- <br />SECOND: (a) South Bend, shall submit to Northern Indiann <br />its <br />plans and specifications for the installation of the sewer lineand <br />shall furnish any reasonable additional information concerning ae <br />construction and installation of said sewer line from time t th <br />requested by Northern Indianao time as <br />. <br />The construction, installation, <br />maintenance and removal of said sewer line shall be accomplished in <br />accordance with good engineering practices. The sewer line shall not <br />interfere in any manner whatsoever with any other underground facilities <br />of Northern Indiana or of any parties in place at the time that said <br />sewer line is installed. In the installation of said sewer line, <br />South Bend shall maintain a minimum distance of 24 inches between its <br />sewer line and Northern Indiana's gas distribution line. Further, <br />South Bend's sewer line will have a minimum of 8 feet of cover at its <br />shallowest point. <br />(b) South Bend shall use every reasonable precaution <br />to prevent injury or damage to trees, shrubs, and fences now or at <br />any time in the future upon, along or adjacent to said Lot. South <br />Bend agrees to be responsible and pay for all damages to Northern <br />Indiana's property caused by construction and maintenance or removal <br />of said sewer line. <br />(c) Notice shall be given by South Bend to Northern <br />Indiana at least seventy-two (72) hours prior to beginning construction <br />so that Northern Indiana may provide for adequate protection of its <br />electrical lines and locate its gas pipeline for South Bend. <br />(d) Whenever it becomes necessary to make any repairs <br />or renewals to said sewer line such repairs or renewals shall be made <br />at the sole expense of South Bend and in such a nature so as to interfere <br />as little as possible with the property or business of Northern Indiana <br />or of -any parties holding under Northern Indiana, and except in the case <br />of emergency repairs or 'renewals, notice of the intent to make such <br />repairs or renewals shall be given by South Bend to Northern Indiana <br />at least seventy-two (72) hours in advance, and promptly upon completion <br />
The URL can be used to link to this page
Your browser does not support the video tag.