Laserfiche WebLink
'CITY OF SOUTH BEND <br />South Brand, Indiana 46601 <br />-6- <br />retaining the potential for interrelated development, <br />e.g., access and internal circulation. The final key <br />assumption is that the master plan must include a develop- <br />ment alternative for each phase. <br />MASTER PLAN <br />A. Plan Concept <br />1. Statement of General Plan Concept <br />2. Identification and Deliniation of Phased <br />Development Areas. <br />3. Identification of Points of Interrelation <br />Between Phased Areas. <br />4. Resolution of Points of Conflict in Linking <br />Phased Redevelopment Areas <br />B. Master Plan and Plan Elements <br />1. General Land Use <br />2. Circulation (Internal - External) <br />(a) Rail <br />(b) Road <br />3. Docking /Loading Facilities <br />4. Parking Facilities <br />5. Traffic Control /Security <br />6. Utilities /Power <br />7. Lighting <br />8., Emergency Services <br />9. Storage <br />10. Waste Removal /Storage <br />11. Environmental Design Standards <br />