My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - WWTP Server Room Fire Suppression System Proj No 124-038R - Larson-Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotations - WWTP Server Room Fire Suppression System Proj No 124-038R - Larson-Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 4:25:16 PM
Creation date
2/11/2025 1:57:02 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/11/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Super -Slide® <br />Mounting Bracket <br />Allows the installer to pre -wire <br />the system, test for system <br />supervision, remove the signal <br />head until occupancy, switch <br />out signals without changing <br />mounting brackets and has <br />locking edge connector for <br />snap -in place installation. IC <br />Candela selection slider <br />switch. Depress center <br />and slide switch to <br />desire brightness level. <br />Break off pin and inser <br />into hole at the botton <br />of the selector to loci <br />candela setting. Signa <br />must be removed fron <br />bracket and pin pushes <br />forward from backsid( <br />out of hole to chang( <br />candela. <br />Checkmate® Instant Voltage <br />Verification <br />It is often necessary to confirm the <br />voltage drop along a line of devices. <br />The access holes are provided in <br />the back of the terminal block to <br />allow the voltage to be measured <br />directly without removing the device. <br />Typically this would be done at the <br />end of the line to confirm design <br />criteria. Most measurements will be <br />taken using the S+ and S- locations <br />although access is provided to other <br />locations. <br />NOTE: Care should be taken to not <br />short the test probes. <br />To remove bezel, grip both sides <br />of bezel and pull in a downward <br />and outward motion. <br />15 cd <br />30 mA <br />42 mA <br />30 cd <br />35 mA <br />58 mA <br />60 cd <br />66 mA <br />97 mA <br />75 cd <br />80 mA <br />116 mA <br />110 cd <br />103 mA <br />161 mA <br />NOTES: <br />• For nominal and peak current across ANSI/UL regulated voltage range <br />for filtered DC power and unfiltered (FWR [Full Wave Rectified]) pow- <br />er, see installation manual. <br />• Janus Fire Systems does not recommend using a coded or pulsing <br />signaling circuit with any of our strobe products. <br />DS1280 Revised: 28-Jan-2014 <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.