PROJECT NAME:
<br />PROJECT NO.
<br />FOR BIDS DUE:
<br />CONTRACTOR NAME:
<br />BASE BID (ADDENDUM NO. 2)
<br />BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Mishawaka Avenue Streetscape
<br />121-072
<br />February 11, 2025, 9:00am, Local Time
<br />Milestone Contractors, L.P.
<br />ITEM
<br />NO.
<br />DESCRIPTION
<br />QUANTITY
<br />UNIT
<br />UNIT
<br />COST
<br />ITEM COST
<br />1
<br />Mobilization and Demobilization
<br />1
<br />LS
<br />289,000.00
<br />$289,000.00
<br />2
<br />Construction Engineering
<br />1
<br />LS
<br />4,194.00
<br />$4,194.00
<br />3
<br />Maintenance of Traffic
<br />1
<br />LS
<br />45,000.00
<br />$45,000.00
<br />4
<br />Erosion Control
<br />1
<br />LS
<br />5,000.00
<br />$5,000.00
<br />5
<br />Clearing Right of Way
<br />1
<br />LS
<br />139,000.00
<br />$139,000.00
<br />6
<br />Excavation, Common
<br />2923
<br />CYS
<br />52.00
<br />$151,996.00
<br />7
<br />Borrow
<br />257
<br />CYS
<br />60.00
<br />$15,420.00
<br />8
<br />Inspection Hole, Greater than 3 ft.
<br />6
<br />EA
<br />2,000.00
<br />$12,000.00
<br />9
<br />Inspection Hole, Less than 3ft.
<br />6
<br />EA
<br />1,500.00
<br />$9,000.00
<br />10
<br />Railroad Tie Removal
<br />500
<br />LIFT
<br />14.00
<br />$7,000.00
<br />11
<br />Concrete, Remove
<br />500
<br />SYS
<br />15.00
<br />$7,500.00
<br />12
<br />Remove Structure
<br />6
<br />EA
<br />500.00
<br />$3,000.00
<br />13
<br />Pipe, Type 2, Circular, 12 in.
<br />623
<br />LFT
<br />52.00
<br />$32,396.00
<br />14
<br />Pipe, Type 2, Circular, 15 in.
<br />90
<br />LIFT
<br />45.00
<br />$4,050.00
<br />15
<br />Pipe, Type 2, Circular, 21 in.
<br />345
<br />LIFT
<br />62.00
<br />$21,390.00
<br />16
<br />Pipe, Type 2, Circular, 24 in.
<br />576
<br />LIFT
<br />78.00
<br />$44,928.00
<br />17
<br />48 in. Type B Manhole
<br />7
<br />EA
<br />8,300.00
<br />$58,100.00
<br />18
<br />60 in. Saddle Manhole
<br />1
<br />EA
<br />14,000.00
<br />$14,000.00
<br />19
<br />Core Hole in Structure
<br />1
<br />EA
<br />2,400.00
<br />$2,400.00
<br />20
<br />Standard Inlet
<br />18
<br />EA
<br />3,400.00
<br />$61,200.00
<br />21
<br />Adjust Casting to Grade, Manhole
<br />12
<br />EA
<br />900.00
<br />$10,800.00
<br />22
<br />Adjust Casting to Grade, Inlet
<br />6
<br />EA
<br />500.00
<br />$3,000.00
<br />23
<br />Adjust Casting to Grade, Valve Box
<br />2
<br />EA
<br />420.00
<br />$840.00
<br />24
<br />Adjust Casting to Grade, Water Curb Stop
<br />6
<br />EA
<br />420.00
<br />$2,520.00
<br />25
<br />Adjust Handhole to Grade
<br />1
<br />EA
<br />342.55
<br />$342.55
<br />26
<br />6 in. Ductile Iron Pipe
<br />26
<br />LIFT
<br />208.00
<br />$5,408.00
<br />27
<br />8 in. Ductile Iron Pipe
<br />208
<br />LIFT
<br />88.00
<br />$18,304.00
<br />28
<br />12 in. Ductile Iron Pipe
<br />1208
<br />LIFT
<br />112.00
<br />$135,296.00
<br />29
<br />8 in. Gate Valve and Box
<br />2
<br />EA
<br />3,700.00
<br />$7,400.00