BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: Mishawaka Avenue Streetscape
<br />Project Number: 121-072
<br />For Bids Due: February 11, 2025, 9:00 a.m., Local Time
<br />Contractor Name: HRP Construction Inc.
<br />ITEM
<br />NO.
<br />DESCRIPTION
<br />QUANTITY
<br />Q
<br />UNIT
<br />UNIT
<br />ITEM COST
<br />COST
<br />115
<br />Transverse Marking, Thermoplastic, Sharrow
<br />I
<br />EA
<br />495.00
<br />495.00
<br />116
<br />Pavement Message Marking, ADA Accessible
<br />Symbol, Blue
<br />I
<br />EA
<br />495.00
<br />495.00
<br />117
<br />Pavement Message Marking, Epoxy, Chevron,
<br />White
<br />6
<br />EA
<br />395.00
<br />2,370.00
<br />118
<br />Transverse Marking, Thermoplastic, Solid Green
<br />Fill Full Width
<br />98
<br />SYS
<br />121.00
<br />11,858.00
<br />119
<br />Transverse Marking, Thermoplastic, Yield Line,
<br />White 18 in.
<br />30
<br />LFT
<br />10.00
<br />300.00
<br />120
<br />Grooving for Pavement Markings
<br />4616
<br />LFT
<br />1.00
<br />4,616.00
<br />121
<br />Temporary Pavement Marking, Removable, 4 in.
<br />725
<br />LFT
<br />1.70
<br />1,232.50
<br />122
<br />Line, Remove
<br />2500
<br />LFT
<br />1.30
<br />3,250.00
<br />123
<br />Sign Post, Square, Type 2, Reinforced Anchor
<br />Base
<br />91
<br />LFT
<br />15.00
<br />1,365.00
<br />124 1
<br />Sodding, Nursery
<br />1733
<br />SYS
<br />11.99
<br />20,778.67
<br />125 1
<br />Topsoil
<br />194
<br />CYS
<br />84.00
<br />16,296.00
<br />BASE BID TOTAL
<br />ALTERNATE BID ADDENDUM NO. 2)
<br />$ 4,205,656.17
<br />ITEM
<br />NO.
<br />DESCRIPTION
<br />QUANTITY
<br />Q
<br />UNIT
<br />UNIT
<br />COST
<br />ITEM COST
<br />I
<br />Light Standard, Type C
<br />10
<br />EA
<br />12,877.00
<br />128,770.00
<br />2
<br />Light Standard Foundation
<br />10
<br />EA
<br />1,400.00
<br />14,000.00
<br />3
<br />Electrical Wiring, #4 XHHW
<br />7300
<br />LFT
<br />8.30
<br />60,590.00
<br />4
<br />Electrical Wiring, #6 XHHW
<br />7300
<br />LFT
<br />6.80
<br />49,640.00
<br />5
<br />HDPE Schedule 80 Conduit, 2 in.
<br />4900
<br />LFT
<br />18.00
<br />88,200.00
<br />6
<br />HDPE Schedule 80 Conduit, 3 in.
<br />150
<br />LFT
<br />21.00
<br />3,150.00
<br />7
<br />Electrical Service Point, Tesco, Single Meter,
<br />Relocate
<br />I
<br />EA
<br />10,000.00
<br />10,000.00
<br />8
<br />Controller Cabinet Foundation, P1
<br />I
<br />EA
<br />1,200.00
<br />1,200.00
<br />9
<br />Handhole, Lighting
<br />1
<br />EA
<br />2,600.00
<br />2,600.00
<br />ALTERNATE BID TOT,
<br />$ 358,150.00
<br />BASE BID AND ALTERNATE BID TOTAL $ 4,563,806.17