Laserfiche WebLink
R.YODEP <br />IC O N a i R U C T 1 0 N <br />Byer's Softball Complex Improvements Phase 1- Project 123-072 <br />Clarifications: <br />1. Trees may not be available until October or November depending on the <br />weather for fall digging. <br />2. Trench drain is assumed to be a Neenah R-4996-C. <br />3. Crackfilling before you overlay is not recommended as the material in the <br />cracks may cause them to bleed through the surface. This is how it is called out <br />in the plans to bid. Would advise to talk the Engineer out of doing this as part of <br />the alternate so the surface looks nicer. <br />Page 11 <br />27453 CR 150 i Nappanee, IN 146550 i Tel: 574.773.3502 i Fax: 574.773.4941 <br />www.ryoderconstruction.com <br />