Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name Byers Softball Complex Improvements Phase 1 -' <br />Project No. 123-072 <br />For Bids Due <br />11,2025 <br />Contractor Name: PREMIUM SERVICES <br />BASE BID <br />No <br />Description <br />Quant, <br />Unit <br />Unit <br />Extension <br />Price <br />1 <br />MOBILIZATION AND DEMOBILIZATION <br />1,00 <br />LS <br />$237,400 <br />$237,400 <br />2 <br />CLEARING RIGHT OF WAY <br />1.00 <br />LS <br />$120,700 <br />$120,700 <br />3 <br />EROSION CONTROL <br />1.00 <br />LS <br />$8,100 <br />$8,100 <br />4 <br />TREE PROTECTION <br />1,00 <br />LS <br />$4,700 <br />$4,700 <br />5 <br />CURB, REMOVE <br />30.00 <br />LFT <br />$25 <br />$750 <br />6 <br />SIDEWALK, CONCRETE, REMOVE <br />338.00 <br />SYS <br />$25 <br />$8,450 <br />7 <br />PLAY EQUIPMENT, REMOVE <br />1,00 <br />LS <br />$5,650 <br />$5,650 <br />8 <br />EXCAVATION, COMMON <br />1,230.00 <br />CYS <br />$66,50 <br />$81,795 <br />9 <br />COMPACTED AGGREGATE NO. 53 <br />263.00 <br />TON <br />$57 <br />$143991 <br />10 <br />HMA PATCHING FULL DEPTH, TYPE B <br />31.00 <br />TON <br />$305 <br />$9,455 <br />11 <br />PARKING LOT, CRACK SEAL AND REPAIR <br />83500.00 <br />SYS <br />$5.80 <br />$493300 <br />12 <br />CURB, CONCRETE <br />30.00 <br />LFT <br />$82 <br />$2,460 <br />13 <br />CURB RAMP, CONCRETE <br />7.00 <br />SYS <br />$265 <br />$1,855 <br />14 <br />DETECTABLE WARNING SURFACES <br />1.20 <br />SYS <br />$400 <br />$480 <br />15 <br />SIDEWALK, CONCRETE, 4 IN, <br />241.00 <br />SYS <br />$98 <br />$23,618 <br />16 <br />SIDEWALK, CONCRETE, 6 IN. <br />768,00 <br />SYS <br />$100 <br />$76,800 <br />17 <br />SIDEWALK, CONCRETE, DECORATIVE <br />235,00 <br />LFT <br />$110 <br />$25,850 <br />Version 07/19/2023 Contractor's Bid for Public Work - 7 <br />