Laserfiche WebLink
Premium Concrete Services, Inc. <br />712 Richmond Street <br />Elkhart, IN 46516 <br />(574) 264-0196 <br />SECTION II PLAN AND EQUIPMENT QUESTIONAIRE <br />1) Project: Byers Softball Complex Improvements Phase 1 PROJECT # 123-072 -Schedule: <br />After given the notice to proceed, Premium Concrete Services, Inc. will then contact Indiana 811 <br />to locate all utility lines within construction limits. Private locates may be necessary. Layout and <br />staking of sites will be next. Then erosion control, removals, excavation, grading, and subgrade <br />with a 3-5 man crew. All field work will commence as soon as weather allows. Work on pressbox <br />will also begin as soon as weather allows with a 2-4 man crew. After excavation and grading <br />phases are complete, concrete work will commence. Forming and pouring of concrete work will <br />be completed with a 5-man crew. Project will finish with parking lot patching, crack seal, repair & <br />striping. Subs will be utilized on this project to complete electric, plumbing, splash pad equipment, <br />crack sealing & repair, pavement markings, landscaping & trucking. Multiple crews may be <br />working at the same time. Project with be completed on schedule. <br />2) a) <br />State <br />Barricading Inc.- <br />24963 <br />US 20 West South Bend, IN 46628—Traffic <br />Maintenance &Signs <br />b) <br />Acorn <br />Landscaping —3680 <br />W <br />Sample St South Bend, IN 46619—Top <br />Soil <br />and Sodding. <br />c) 1'` Class Logistics — 2213 St Charles St South Bend, IN 46614 -Trucking <br />d) Hawk Enterprises —1850 East North St Crown Point, IN 46307 - Electric <br />e) KC Tree, Inc— 8913 East US Hwy 20 New Carlisle, IN 46552 —Tree Removal <br />f) A-1 Striping Service Inc. —56825 Spirea Rd. New Carlisle, IN 46552 — Painting <br />g) Slusser's Green Thumb, Inc. —1610 Genesis Dr LaPorte, IN 46350 - Landscaping <br />h) Herrman & Goetz, Inc. — 225 South Lafayette Blvd, IN 46601— Electric & Plumbing <br />Premium Concrete Services, Inc. Does not require bonding for its subcontractors <br />3) Will supply list of subcontractors soon after award of project. <br />4) Equipment use for project: Cl ;A <br />Steers, Mini Excavators, <br />Excavators, Compactors, Rollers, Wall< - <br />behind Saws, Cut-off <br />Saws, Friction <br />Screed, Dump Trucl<. <br />Current plan is to used owned <br />equipment, however <br />depending <br />on workload some rental equipment may be necessary. <br />5) Yes, Premium Concrete Services, Inc. has quotes for all materials in proposal. <br />