My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Byer's Softball Complex Improvements Proj No 123-072 - Premium Concrete Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Bids
>
Opening of Bids - Byer's Softball Complex Improvements Proj No 123-072 - Premium Concrete Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2025 1:48:12 PM
Creation date
2/11/2025 1:46:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/11/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NIPSCO 2021 Restoration <br />South Bend, Mishawaka & Elkhart <br />NIPSCO <br />$ 907,411.20 <br />Various concrete and asphalt utility repair work <br />2021 Goshen Concrete Repair <br />Goshen <br />City of Goshen <br />$ 657,021.80 <br />Pavement removal and replacement, catch basin aprons, curb removal <br />and replacement <br />2021 City of Elkhart -Misc. Work <br />Elkhart <br />City of Elkhart <br />$118,397.40 <br />Various concrete curb, sidewalk and asphalt work <br />2021 City of Mishawaka Curb & Sidewalk <br />Mishawaka <br />City of Mishawaka <br />$ 131,821.95 <br />Sidewalk, curb & gutter and approaches <br />South Bend Waterworks-2021 <br />South Bend <br />City of South Bend <br />$142,394.05 <br />Various concrete and asphalt utility repair work <br />Fairfield Jr/Sr High School <br />Goshen <br />Michiana Contracting <br />$609,101.50 <br />Sidewalk,pavement,curb, retaining walls, building foundations <br />NIPSCO 2021 Restoration <br />South Bend, Mishawaka & Elkhart <br />NIPSCO <br />$ 949,378.00 <br />Various concrete and asphalt utility repair work <br />2022 City of Elkhart- Misc. Work <br />Elkhart <br />City of Elkhart <br />$164,520.75 <br />Various concrete curb, sidewalk and asphalt work <br />COE Curb Ramp Project <br />Elkhart <br />City of Elkhart <br />$197,531.00 <br />ADA Sidewalk and Curb Ramps <br />Transpo Parking Lot Upgrades <br />South Bend <br />City of South Bend <br />$ 225,691.00 <br />Remove and replace concrete parking lots, replace curbs <br />City of South Bend Water Works- 2022 <br />South Bend <br />City of South Bend <br />$153,405.75 <br />Various concrete and asphalt utility repair work <br />City of South Bend Sidewalk Project 2022 <br />South Bend <br />City of South Bend <br />$ 392,696.03 <br />Sidewalk, curb & gutter, approaches <br />NIPSCO 2023 Restoration <br />South Bend, Mishawaka &Elkhart <br />NIPSCO <br />$ 1,943,699.20 <br />Various concrete and asphalt utility repair work <br />2023 City of Elkhart -Misc. Work <br />Elkhart <br />City of Elkhart <br />$ 257,910.67 <br />Various concrete curb, sidewalk and asphalt work <br />City of Elkhart Main Street Concrete Repairs <br />Elkhart <br />City of Elkhart <br />$ 507,768.50 <br />Sidewalk, ADA sidewalk and Curb Ramps, Colored Concrete <br />City of Elkhart - South Main Streetscape <br />Elkhart <br />City of Elkhart <br />$ 549,339.50 <br />Sidewalk, Approaches, Curb Ramp, Curb and Lighting <br />Mishawaka 2022 CDBG Improvements <br />Mishawaka <br />City of Mishawaka <br />$ 386,750.56 <br />ADA Sidewalk and Curb Ramps <br />City of South Bend 2023 Curb & Sidewalk Program <br />South Bend <br />City of South Bend <br />$ 641,533.82 <br />Sidewalk, curb & gutter and approaches <br />
The URL can be used to link to this page
Your browser does not support the video tag.