Laserfiche WebLink
City of South Bend, Indiana <br />2013 Budget Departmental Summary <br />Fund Name Water Works - Ca ffal funs <br />Fund Number 622 <br />Five -Year Capital Improvement Plan <br />Funding 2013 2014 2015 <br />2016 2017 <br />Name Source Budget Projection Projection <br />Pm action Pm action Total <br />Replacement Capital <br />1 <br />Computer Equipment 8 Nehvork Cash 10,000 10,000 10,000 <br />10,000 10,000 5,000 <br />2 <br />Dishmmon EquiPRefuMisi Pumpa&W Cash 40,000 30,000 30,000 <br />30,000 30,000 160,000 <br />3 <br />Electronic Pump DmesWintarbeny Cash 16,500 - - <br />- - 16,500 <br />4 <br />Fencing Replacement Cleveland WF Cash - - - <br />- 20,000 20,000 <br />5 <br />Magnetic Flow Meter Replacements Cash 13,000 10,500 - <br />- - 23,500 <br />6 <br />North Station Clay Tile Beef Replaceme Cash 190,000 <br />19,000 <br />] <br />No.Station Steel Pipe Replacement Cash 40,000 25,000 15,000 <br />- - 8,000 <br />8 <br />Northwest Elevated Tank Recasting Cash 162,800 <br />- - 162,800 <br />9 <br />Olive GAG Bldg Roof Membrane Repla, Cash 6,000 <br />- - 6,000 <br />10 <br />Well #3 Replacement at Pintrook Cash 245,000 <br />- - 245,000 <br />11 <br />4WD SUV Ford E.pe(1) Cash 24,000 <br />24,000 <br />12 <br />4WD Mini Cargo Van (5) Cash 110,000 <br />110,000 <br />13 <br />Future Fleet Replacement Plan Cash 175,000 <br />30,000 150,000 625,000 <br />14 <br />Water Meters Cash 300,000 300,000 <br />400,000 40,000 1,400,000 <br />15 <br />16 <br />- <br />1] <br />- <br />Pmiect Capital <br />18 <br />Building for Generator w /Switch Gear Cash - - - <br />60,000 - 60,000 <br />19 <br />Davit Ann Retrieval Equipment Cash 15,475 - - <br />- - 15,475 <br />20 <br />Fire Hyde MS Cash 50,000 50,000 50,000 <br />50,000 50,000 250,000 <br />21 <br />Fireproof File Cabinet Cash 5,200 - - <br />- - 5,200 <br />22 <br />Generator vaSwitch Gear Cash - - - <br />250,000 250,000 <br />23 <br />LapTop for Meter Read ing(w /support) Cash 5,575 - - <br />- - 5,575 <br />24 <br />Sofvvam -Allen Bradley Proc.. Cash 10,900 - - <br />- - 10,900 <br />25 <br />Sofhvmm- Backflow Pro, B Valve Maint Cash 10,000 - - <br />- - 10,000 <br />26 <br />Soflwane- Inrfrashuc[ua Prevent Ma int Cash 9,850 - - <br />- - 9,850 <br />27 <br />Water Main Extruders Cash 400,000 400,000 400,000 <br />400,000 400,000 2,000,000 <br />28 <br />- <br />29 <br />- - - <br />- <br />30 <br />31 <br />32 <br />33 <br />34 <br />Total 950,500 1,006,500 1,212,800 <br />1,250,000 1,310,000 5,]29,800 <br />Funding Sources: Cash, Lease, Gan[, Bold, Contributed Capital <br />Justficatian: <br />1 Annual ongoing replacement program for daskfops,netwmk upgei and SCADA <br />2 Large high Service pumps and motors as refurbished to restore efficiency <br />3 Electronic pump tlmes am olsvkde and need to be replaced. It is not cost effectivec M1ave refurbisM1ed. <br />4 The svutM1Side fencing section at Me Cleveland Well Field was not completed at Me same time as the other tM1me sides <br />5 A magnetic Busy meter at North Pumping Station and at Olive have reached life expectancy <br />6 The North Station clay tile roofing B asking and is causing interior damage. <br />] North Station Vessel stainless steel piping B asking and needs to be raptured. <br />8 The exterior ceating on Me elevated tank is beyond its 15 year life cycle <br />9 The rubber roofing membrane patching on the Olive GAG building has rot lasted and has determated. <br />10 Pinhook well M1as lostrapardy clue c age. It B most cost effective c repute Men c continue with cleanings. <br />11 Unit 502 B replacing a current unit wiM high mileage and increased repair cost. <br />12 Units 514, 551, 5%, 557, and 562 am van replace ants forcurnennt units wiM high mileage and increased repair cost. <br />13 Future Fleet Replacement Pun consists of general replacement due to functionality, safety, and overall condition. <br />14 Water meters Provide consumption numbers for billing purposes. <br />15 <br />16 <br />1] <br />18 A generator crated at Cleveland Well Field South is exposed to the elements and should be housed in a building <br />19 Safety retrieval equipment B needed to loser and raise employees safely out of a wafer mmuvmi <br />20 Fire Hydrants provice expansion of fire service area. Damaged hydrants are replaced, guy cannot be repaired. <br />21 Customer Service office needs a lockable fireproof cabinet to store various suradve retention documents. <br />22 Two sells and the Gei Activated Carbon (GAG) units at Olive have no power supply backup. <br />23 An additional laptop B needled for picking up automated drive by meter mads. <br />24 Software and technical support B needled for Me Allen Bradley pnocessvrs. <br />25 A database software program B needed to our Backfcw Program aria for the Valve Maintenance Program. <br />26 An asset management software program is needed to assist wiM maintaining and protecting the waters infrastructure. <br />27 Various new main extension projects as well as extended looping. <br />28 <br />29 <br />30 <br />1 <br />32 <br />33 <br />34 <br />Page 236 <br />Form 1 <br />