Laserfiche WebLink
ANNUAL OPERATIONAL REPORT <br />FOR LOCAL ROADS AND STREETS <br />SECTION Illa - CONSTRUCTION AND RECONSTRUCTION <br />Part of State Form 54400 (8 -10) <br />NOTE: These are the same funds reported in Section II, with additional information on Individual projects. <br />ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND <br />ROADISTREET PROJECTS <br />Location of Project <br />Area <br />Type of Work <br />Project Cost (Provide this information only if known) <br />Road /Street <br />Address <br />Length <br />(mi) <br />Width <br />(ft) <br />O <br />2 <br />3 <br />z <br />O <br />rz <br />� <br />N <br />N <br />[D c� <br />0 <br />w <br />- -5 <br />H <br />� <br />.9 <br />� <br />ii <br />O <br />U <br />� <br />U <br />N <br />ig <br />� <br />¢ <br />a <br />N <br />J <br />¢ <br />-J <br />i= <br />E <br />6 <br />W <br />¢ <br />°� <br />O <br />U <br />3 <br />F <br />William-St..--- <br />1633 <br />X <br />$222.00 <br />$222.00 <br />William St. <br />2215 <br />X <br />$222.00 <br />$222.00 <br />Taylor St. <br />1916 <br />X <br />$222.00 <br />_ <br />$222.00 <br />Taylor St. <br />2010 <br />x <br />$222.00 <br />$222.00 <br />Jackson St. <br />437 <br />_ <br />X <br />$222.00 <br />$222.00 <br />Sheridan Ave. <br />840 <br />X <br />$222.00 <br />$222.00 <br />Illlnols St. <br />843 <br />X <br />$222.00 <br />_ <br />$222.00 <br />Indiana Ave. <br />2011 <br />X <br />$222.00 <br />$222.00 <br />Indiana Ave. <br />2109 <br />X <br />_ <br />$222.00 <br />$222.00 <br />Indiana Ave. <br />1925 <br />X <br />$222.00 <br />$222.00 <br />Taylor St. <br />1615 <br />X <br />$222.00 <br />$222.00 <br />Indiana Ave. <br />618 <br />X <br />$222.00 <br />$222.00 <br />Scott St. <br />1316 <br />X <br />$222.00 <br />$222.00 <br />Calvert St. <br />1613 <br />X <br />$222.00 <br />$222.00 <br />Emerson St. <br />813 <br />X <br />$222.00 <br />$222.00 <br />24th St. <br />601 <br />X <br />$222.00 <br />$222.00 <br />27th St. <br />930 <br />X <br />$222,00 <br />$222.00 <br />Home Ct. <br />2817 <br />X <br />$222.00 <br />$222.00 <br />30th St. <br />1215 <br />X <br />$222.00 <br />$222.00 <br />29th St. <br />518 <br />X <br />$222.00 <br />$222.00 <br />South St. <br />614 <br />X <br />$222.00 <br />$222.00 <br />South St. <br />416 <br />X <br />$222.00 <br />$222.00 <br />Tutt St. <br />127 <br />x <br />$222.00 <br />$222.00 <br />TOTAL MVH FUNDS FOR ROADISTREET CONSTRUCTION AND RECONSTRUCTION $ <br />$114,996 <br />P. 26 <br />