Laserfiche WebLink
ANNUAL OPERATIONAL REPORT <br />FOR LOCAL ROADS AND STREETS <br />SECTION Illa - CONSTRUCTION AND RECONSTRUCTION <br />Part of State Form 54400 (8 -10) <br />NOTE: These are the same funds reported in Section II, with additional Mormation on individual projects. <br />ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND <br />ROADISTREET PROJECTS <br />Location of Project <br />Area <br />Type of Work <br />Project Cost (Provide this information only if known) <br />Road /Street <br />Address <br />Length <br />(Mt) <br />Width <br />{ft) <br />� <br />o <br />u <br />U <br />3 <br />z <br />a <br />� <br />6z <br />� <br />� <br />v <br />(n <br />v <br />v <br />LL <br />U <br />U <br />2 <br />0 <br />¢ <br />R <br />� <br />¢ <br />� <br />E <br />.2L <br />W <br />°� <br />O <br />CJ <br />t2 <br />Dubai] Ave. <br />302 <br />+-xx <br />$222.00 <br />$222.00 <br />Dubail Ave. <br />230 <br />$222.00 <br />$222.00 <br />Calvert St. <br />895 <br />X <br />$222.00 <br />$222.00 <br />Ironwood Dr. <br />754 <br />X <br />$222,00 <br />$222.00 <br />Ironwood Dr. <br />634 <br />X <br />$222.00 <br />$222.00 <br />23rd St. <br />502 <br />X <br />$222.00 <br />$222.00 <br />23rd St. <br />702 <br />X <br />$222.00 <br />$222.00 <br />24th St. <br />844 <br />X <br />$222.00 <br />$222,00 <br />24th St. <br />754 <br />X <br />$222.00 <br />$222.00 <br />24th St. <br />502 <br />X <br />$222.00 <br />$222.00 <br />25th St. <br />506 <br />X 1 <br />$222.00 <br />$222.00 <br />25th St. <br />754 <br />X <br />$222.00 <br />$222.00 <br />26th St. <br />502 <br />X <br />$222.00 <br />$222.00 <br />26th St. <br />702 <br />X <br />$222.00 <br />$222.00 <br />26th St. <br />806 <br />X <br />$222.00 <br />$222.00 <br />30th St. <br />729 <br />X <br />$222.00 <br />$222.00 <br />30th St. <br />529 <br />X <br />$222.00 <br />$222.00 <br />29th St. <br />728 <br />X <br />1 <br />$222.00 <br />$222.00 <br />29th St. <br />841 <br />X <br />$222.00 <br />$222.00 <br />30th St. <br />502 <br />X <br />$222.00 <br />$222.00 <br />30th St. <br />726 <br />X <br />$222.00 <br />$222.00 <br />30th St. <br />802 <br />X <br />$222.00 <br />$222.00 <br />32nd St. <br />840 <br />X <br />$222.00 <br />$222.00 <br />32nd St. <br />501 <br />X <br />$222.00 <br />$222.00 <br />Mish. Ave. <br />3109 <br />X <br />$222.00 <br />$222.00 <br />32nd St. <br />502 <br />X <br />$222.06 <br />$222.00 <br />33rd St. <br />502 <br />X <br />$222.00 <br />$222.00 <br />33rd St. <br />602 <br />X <br />X <br />$222.00 <br />$222.00 <br />33rd St. <br />754 <br />$222.00 <br />$222.00 <br />34th St. <br />841 <br />X <br />$222.00 <br />$222.00 <br />34th St. <br />842 <br />X <br />$222.00 <br />$222.00 <br />Logan St. <br />841 <br />X <br />$222.00 <br />$222.00 <br />30th St. <br />1002 <br />X <br />$222.00 <br />$222.00 <br />P. 12 <br />