My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appropriating $18,000.00 Bureau of Water Budget of the Water Works General Fund Design of Additional Water Storage
sbend
>
Public
>
Common Council
>
Legislation
>
Ordinances
>
1981
>
Appropriating $18,000.00 Bureau of Water Budget of the Water Works General Fund Design of Additional Water Storage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2013 10:08:30 AM
Creation date
5/10/2013 9:08:26 AM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Ordinances
City Counci - Date
11/23/1981
Ord-Res Number
7001-81
Bill Number
127-81
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. Plans and Specifications <br />C <br />E <br />F <br />It <br />The Engineer will design the reservoir and re- <br />lated work in accordance with current AWWA speci- <br />fications and good engineering practices, and pro- <br />vide the Owner with plans and specifications that <br />can be used for bidding purposes. <br />Bid Documents <br />The Engineer will prepare the necessary bid docu- <br />ments and assist the Owner in the opening of bids <br />and award of contract. <br />Field Layout <br />The Engineer will provide the Contractor with suf- <br />ficient information to provide for the correct <br />location of the reservoir on the property. <br />Soils Information <br />Information on soil borings at the reservoir site <br />will be used as a basis of design of the reservoir, <br />footings and slabs. If additional soil borings are <br />necessary for design purposes, they will be obtained <br />and paid for under Item IV B. <br />Utilities <br />The Owner will provide the Engineer with informa- <br />tion on the size, depth and location of sanitary <br />and storm sewers, water mains and other utilities <br />in the vicinity of the project. <br />Conferences <br />The Engineer shall attend such conferences with <br />representatives of the Owner and other interested <br />agencies as may be required in connection with the <br />work. The Engineer shall also assign a project <br />engineer qualified to act, in a liaison capacity, <br />and to be available at all times, on matters per- <br />tinent to the project. <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.