GENERAL & CONSTRUCTION NOTES DRAWINGS
<br />1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH STATE AND LOCAL AGENCY SPECIFICATIONS UNLESS SPECIFICALLY STATED 1. THE WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE FOLLOWING ATTACHED DRAWINGS THAT ARE HEREBY MADE
<br />OR SHOWN OTHERWISE HEREIN. A PART OF THE STATEMENT OF WORK, BY THIS REFERENCE.
<br />2. ALL WORK SHALL CONFORM TO ALL APPLICABLE ELECTRICAL CODES EXCEPT W HEN STATE DEPARTMENT OF TRANSPORTATION AND
<br />LOCAL AGENCY STANDARDS SUPERSEDE.
<br />3. CONTRACTOR SHALL ENSURE ALL PROPOSED EQUIPMENT INSTALLED IS IN ACCORDANCE WITH NESC REQUIREMENTS AND
<br />CLEARANCES.
<br />4. ALL CONSTRUCTION AND/OR MAINTENANCE ON THE INDIANA DEPARTMENT OF TRANSPORTATION RIGHT OF WAY SHALL CONFORM
<br />TO THE FEDERAL MANUAL ON UNIFORM TRAFFIC DEVICES, THE INDIANA DEPARTMENT OF TRANSPORTATION ROADWAY AND TRAFFIC
<br />DESIGN STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, PLANS PREPARATION MANUAL AND DRAINAGE MANUAL.
<br />S. THE PERMITTING AGENCY RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY PERMITTED METHODS OF INSTALLATION, SCOPE
<br />OF WORK AND RESTORATION THAT MAY BE REQUIRED TO POSITIVELY SUPPORT LIFE, SAFETY AND ENVIRONMENTAL WELL BEING OF
<br />ALL USERS OF THE TRANSPORTATION SYSTEM.
<br />6. SHOULD A CONFLICT ARISE BETWEEN THE DETAILS SHOWN IN THE PLANS AND THE DEPARTMENT OF TRANSPORTATION STANDARDS,
<br />THE ENGINEER/PERMITTEE SHALL IMMEDIATELY CONFER WITH THE DEPARTMENT'S ENGINEER IN ORDER TO RESOLVE THE DISCREP-
<br />ANCY. IN NO CASE WILL ANYTHING LESS THAN THE DEPARTMENTS MINIMUM STANDARDS BE ALLOWED.
<br />7. FLOCK SAFETY SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES 48 HOURS PRIOR TO CONSTRUCTION.
<br />7.1. INSTALLS INVOLVING FLOCK SAFETY PROVIDED POLES, A MINIMUM OF 2' SEPARATION SHALL BE MAINTAINED FROM ALL EXISTING
<br />UTILITIES AND STORM DRAIN STRUCTURES.
<br />8. THE PERMITTED WORK SCHEDULE IS DEFINED AS MONDAYTHROUGH FRIDAY T.00AM TO 5:30PM UNLESS OTHERWISE NOTED WITHIN
<br />THE PERMIT. ANY WORK DESIRED OUTSIDE OF THIS PERIOD MUST BE REQUESTED IN ADVANCE AND APPROVED BEFORE WORKING
<br />THE ALTERNATE SCHEDULE.
<br />9. FLOCK SAFETY SHALL BE RESPONSIBLE TO APPLY AND OBTAIN AN APPROVED TRAFFIC CONTROL PLAN IN ACCORDANCE WITH
<br />MUTCD AND LOCAL STANDARDS AS REQUIRED.
<br />10. WORK INVOLVING TEMPORARY LANE CLOSURES ARE TO BE DONE BETWEEN THE HOURS OF 8:OOAM AND 5:OOPM. MONDAYTHROUGH
<br />FRIDAY UNLESS OTHERWISE STATED BY THE DEPARTMENT OF TRANSPORTATION.
<br />11. CONTRACTOR SHALL PROVIDE SAFE ACCESS PER CURRENT GENERAL STANDARDS FOR ALL PEDESTRIAN TRAFFIC REGULATIONS
<br />ON ALL EXCAVATIONS OPENED IN THE TRAFFIC ZONE CONTROL AREA.
<br />12. NO PEDESTRIAN PATHWAY IS TO BE REMOVED, BLOCKED, OR DISTURBED WITHOUT HAVING A SUFFICIENT DESIGNATED TEMPORARY
<br />PEDESTRIAN PATHWAY WITH ALL APPROPRIATE PEDESTRIAN MAINTENANCE OF TRAFFIC SIGNS IN PLACE PRIOR TO PATHWAY BEING
<br />AFFECTED.
<br />12.1. ALL TEMPORARY PEDESTRIAN PATHWAYS MUST BE FIRM AND UNYIELDING.
<br />13. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL ADJACENT PROPERTY IN THE VICINITY OF THE CONSTRUCTION.
<br />14. NO WORK SHALL BE PERFORMED DURING THE WEEKS OF ANY STATE OR FEDERAL HOLIDAYS UNLESS OTHERWISE APPROVED BY
<br />THE INDIANA DEPARTMENT OF TRANSPORTATION.
<br />15. ALL WORK ZONES ARE TO BE SET UP AND MAINTAINED BY SOMEONE WHO HAS THE INDIANA DEPARTMENT OF TRANSPORTATION
<br />INTERMEDIATE TRAFFIC CONTROL LEVEL TRAINING OR EQUIVALENT.
<br />16, THE PERMITTING AGENCY RETAINS THE RIGHT TO MAKE ALTERATIONS TO THE PERMIT, ATTACHED SKETCH OR CHARACTER OF
<br />WORK AS MAY BE CONSIDERED NECESSARY OR DESIRABLE DURING THE PROGRESS OFTHE WORK FOR SATISFACTORY COMPLETION
<br />OF THE PROPOSED CONSTRUCTION.
<br />17. THE PERMITTEE SHALL NOTIFY THE PERMITTING AGENCY OF DATE OF COMPLETION, REQUEST A FINAL INSPECTION AND A NOTICE
<br />OF FINAL ACCEPTANCE.
<br />18. IF THE PROPOSED CANNOT BE INSTALLED PER THE APPROVED PERMITTED PLAN AND BY GENERAL SPECIFICATIONS, A REVISED
<br />PLAN MUST BE PROVIDED TO THE DEPARTMENT FOR REVIEW AND APPROVAL PRIOR TO THE INSTALLATION OF PRODUCTS OR
<br />MATERIALS AT THE GIVEN LOCATIONS WHERE CONFLICTS OCCUR.
<br />19. CONTRACTOR SHALL RESTORE RIGHT-OF-WAY TO EQUAL OR BETTER CONDITION UPON COMPLETION OF WORK AND TOTHE
<br />SATISFACTION OFTHE STATE DEPARTMENT OF TRANSPORTATION AND LOCAL AGENCY AT NO ADDITIONAL COMPENSATION.
<br />19.1. RESTORATION MAY INCLUDE BUT IS NOT LIMITEDTO GRADING AND SODDING IN ANY DISTURBED AREA.
<br />19.2. ANY SIDEWALK DISTURBED WILL BE REPLACED BY SECTION WITHIN 72 HOURS TO THE STATE DEPARTMENT OF TRANSPORTAION
<br />SPECIFICATIONS.
<br />20. IT WILL BETHE RESPONSIBILITY OFTHE PERMITTEE TO REPAIRANY DAMAGE TO GENERAL FACILITIES AND/OR PRIVATE PROPERTY
<br />CAUSED BY CONSTRUCTION OF THE PROJECT.
<br />21. ALL ROADWAY PAVEMENT, CURBS,GUTTERS AND STORM WATER COLLECTORS WILL BE KEPT FREE OF MUD AND OTHER DEBRIS AT
<br />ALL TIMES DURING CONSTRUCTION.
<br />22. NO STOCKPILING, STORING OR SEMIPERMANENT USE OF THE RIGHT OF WAY IS AUTHORIZED UNLESS SPECIFICALLY IDENTIFIED
<br />WITHIN THE PERMIT.
<br />23. THE CONTRACTOR SHALL HAVE AN AUTHORIZED PERSON AVAILABLE AT/OR NEAR THE WORK SITE TO ADDRESS EMERGENCY
<br />ISSUES ASSOCIATED WITH THE PROJECT.
<br />ADA COMPLIANCE NOTES
<br />1. ALL SIDEWALK CONSTRUCTION SHALL BE IN ACCORDANCE WITH ADA TITLE II AND ALL STATE DEPARTMENT OF TRANSPORTATION
<br />AND LOCAL STANDARDS. USE STATE DEPARTMENT OF TRANSPORTATION CURRENT EDITION STANDARDS FOR PEDESTRIAN CONTROL
<br />PLANS FOR CLOSURE OF SIDEWALK.
<br />2. MINIMUM SIDEWALK CLEAR PEDESTRIAN ACCESS ROUTE (PAR) IS 48" WIDE.
<br />3. NO OBSTRUCTION IS PERMITTED ALONG THE WIDTH OF THE SIDEWALK UP TO T-0" IN HEIGHT.
<br />SPECIFICATIONS
<br />1. THE WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE SPECIFICATIONS CONTAINED IN THAT CERTAIN "MASTER
<br />AGREEMENT, OUTSIDE PLANT MAINTENANCE CONSTRUCTION SERVICES,- PROVIDED THAT SUCH AN AGREEMENT EXISTS BETWEEN
<br />FLOCK SAFETY AND CONTRACTOR. IN THE ABSENCE OF SUCH AN AGREEMENT, THE SPECIFICATIONS CONTAINED IN AN AGREEMENT
<br />TO BE EXECUTED BY THE PARTIES PRIOR TO THE COMMENCEMENT OF WORK SHALL GOVERN.
<br />MATERIALS
<br />1. INSTALLER SHALL RECEIVE FLOCK SAFETY MATERIALS AT A FLOCK SAFETY LEASED WAREHOUSE FACILITY OR AT THE LOCAL TSO
<br />LOCATED AT (CONTACT 24 HOURS IN ADVANCE): 1170 HOWELL MILL RD NW, ATLANTA, GA 30318.
<br />1.1. ALL UNUSED AND REQUESTED SALVAGED MATERIAL TO BE RETURNED TO SAME ADDRESS.
<br />2. THE RECEIPT OF ALL MATERIALS SHALL BE CONSTRUED AS CONCLUSIVE EVIDENCE THAT THE CONTRACTOR HAS MADE ALL
<br />NECESSARY EXAMINATION AND INSPECTIONS, AND IS SATISFIED AS TO THE QUALITY AND QUANTITY OF MATERIALS RECEIVED.
<br />3. ANY AND ALL MATERIALS THAT MAY BECOME LOST, STOLEN OR DAMAGED SHALL BE REPLACED BY THE CONTRACTOR AT THE
<br />CONTRACTOR'S SOLE EXPENSE, AND ANY DELAY INCURRED SHALL NOT BE CAUSE FOR AN EXTENSION IN TIME
<br />SAFETY AND PRECAUTIONS
<br />1. ALL PERSONNEL ARE REQUIRED TO ABIDE BY ALL RULES AND REGULATIONS SET FORTH IN THE FLOCK SAFETY REQUIREMENTS,
<br />RAILROAD SAFETY CODE AND GOVERNING JURISDICTION.
<br />2. THE WORK UNDER THIS INSTALLATION WILL BE CONSTRUCTED ALONG RIGHTS OF WAY THAT MAY CONTAIN EXISTING AND OPERA-
<br />TIONAL UTILITIES.THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR LOCATING EXISTING UTILITIES AND FOR COMPLIANCE WITH
<br />THE REQUIREMENTS OF ANY STATEWIDE AND / OR LOCAL AREA IN ADVANCE OF ANY EXCAVATION, BORING OR PLACING WORK AND THE
<br />CONTRACTOR SHALL LOCATE AND EXPOSE BY HAND ALL EXISTING SUBSURFACE PLANT.ANY DAMAGE CAUSED BY THE CONTRACTOR
<br />SHALL BE REPAIRED BY THE CONTRACTOR ATTHE CONTRACTOR'S SOLE EXPENSE AND ANY DELAY INCURRED SHALL NOT BE CAUSE
<br />FOR AN EXTENSION IN THE TIME OF THE CONTRACT.
<br />3. INSTALLER SHALL BE RESPONSIBLE FOR THE PROTECTION AND MAINTENANCE OF PUBLIC AND PRIVATE PROPERTIES. INSTALLER
<br />SHALL PROTECT, SHORE, BRACE, SUPPORT AND MAINTAIN ALL UNDERGROUND PIPES, CONDUITS, DRAINS AND OTHER SUBSURFACE
<br />STRUCTURES UNCOVERED OR OTHERWISE AFFECTED BY THE WORK.
<br />4. INSTALLER SHALL BE RESPONSIBLE FOR ALL DAMAGE TO STREETS, ROADS, HIGHWAYS, SHOULDERS, DITCHES, EMBANKMENTS,
<br />CULVERTS, BRIDGES OR OTHER PUBLIC OR PRIVATE PROPERTY OR FACILITY, REGARDLESS OF LOCATION OR CHARACTER, WHICH
<br />MAY BE CAUSED BYTHE WORK, OR BY MOVING, HAULING, OR OTHERWISE TRANSPORTING EQUIPMENT, MATERIALS OR WORKERSTO
<br />OR FROM WORK OR ANY SITE THEREOF, WHETHER BY THE CONTRACTOR OR SUBCONTRACTORS.
<br />STAKING AND SCHEDULING
<br />1. ALL STAKING WILL BE PROVIDED BY FLOCK SAFETY. REQUIRED RIGHT OF WAY CLEARING SHALL BE COMPLETED PRIOR TO STAKING:
<br />THEREFORE, THE INSTALLER SHALL COORDINATE ALL CLEARING AND PLACING OPERATIONS WITH THE FLOCK SAFETY PROJECT
<br />SUPERVISOR TO AVOID DELAYS AND INTERFERENCE.
<br />2. FLOCK SAFETY WILL PROVIDE RAILROAD, FLAGMEN AND SIGNALMEN AS REQUIRED: HOWEVER, THE CONTRACTOR SHALL BE
<br />REQUIRED TO COORDINATE ITS NEEDS FOR SUCH SIGNALMEN AND FLAGMEN WITH FLOCK SAFETY.
<br />3. IN ADDITION TO THE SCHEDULING REQUIREMENTS IN THE GENERAL PROVISIONS, UPON REQUEST THE CONTRACTOR SHALL
<br />ALSO SUBMITTO THE FLOCK SAFETY PROJECT SUPERVISOR, DAILY CREW ASSIGNMENT REPORTS SPECIFYING CREW AND CREW
<br />COMPOSITION AND WORK LOCATION.
<br />PERMITS
<br />1. FLOCK SAFETY HAS OBTAINED OR WILL OBTAIN PERMITS FROM DEPARTMENTS AND/OR AGENCIES OF CITIES, COUNTIES, STATES,
<br />FEDERAL GOVERNMENT, RAILROAD OR OTHER ENTITIES, WHICH PROVIDE FOR THE PLACING OF PIPES AND/OR CABLE UNDER DITCH,
<br />TRACKS AND ROADS AND PLACING PIPES AND/OR CABLE ALONG AND WITHIN PUBLIC OR PRIVATE ROAD RIGHTS OF WAY AND RAILROAD
<br />RIGHTS.
<br />2. CONTRACTOR SHALL OBTAIN ADDITIONAL PERMITS, IF REQUIRED, FOR EQUIPMENT ACCESS OR MOVEMENT ON PUBLIC ROADS AND
<br />RAILROADS. COPIES OF SUCH PERMITS SHALL BE FURNISHED TO FLOCK SAFETY. ALL TRAFFIC CONTROL, IF APPLICABLE, SHALL BE
<br />IN ACCORDANCE WITH LOCAL, STATE, COUNTY, OR PERMITTING AGENCY LAWS, REGULATIONS, AND REQUIREMENTS, AND WILL BE
<br />THE CONTRACTOR'S RESPONSIBILITY. TRAFFIC CONTROL PLANS PROVIDED BY CURRENT INDIANA DEPARTMENT OF TRANSPORTATION
<br />DESIGN STANDARDS.
<br />SCOPE OF WORK
<br />1. THIS PROJECT SHALL CONSIST OFTHE FOLLOWING OPERATIONS: THE WORK PACKAGE IS FOR THE INSTALLATION OF FLOCK SAFETY
<br />ALPR CAMERAS WHICH INCLUDES BUT IS NOT LIMITED TO: FLOCK SAFETY PROVIDED POLES, POLE MOUNTED SOLAR PANELS, AND
<br />EXTERNAL BATTERY PACKAGES.
<br />[THIS SPACE LEFT INTENTIONALLY BLANK FOR STAMPI
<br />IN - South Bend PD
<br />00780835
<br />Flock Safety
<br />1170 HOWELL MILL ROAD SUITE 210
<br />ATLANTA, GA 30318
<br />REV
<br />DATE
<br />BY
<br />DESCRIPTION
<br />0
<br />10/30/2024
<br />FLK
<br />PRELIM
<br />REBYCERTIFYTHISDOCUMENTWASPREPAREDBVMYSELF OR(HE
<br />NDER MV DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED
<br />ENGINEER UNDER THE LAWS OF THE STATE OF INDIANA
<br />(THIS SPACE LEFT INTENTIONALLY BLANK FOR STAMP]
<br />LICENSE PLATE READER CAMERA INSTALLATION
<br />CASE NUMBER: 00780835
<br />PERMITTING JURISDICTION: South Bend (CityoD,
<br />Right -of -Way
<br />GN.01
<br />DOCUMENT HAS BEEN DRAWN BASED OFF THE MOST RECENT AVAILABLE DATA & AERIAL IMAGERY. THIS INCLUDES RIGHT OF WAY, EXISTING UTILITIES, & PRIVATE PROPERTY LINES. IT REMAINS THE RESPONSIBILITY OF OTHERS TO VERIFY ALL DATA PRIOR AND EXISTING SURROUNDING FACILITIES TO VERIFY & CONFLICTS ABOVE & BELOW GRADE. ALL CONSTRUCTION TO FOLLOW INDIANA DEPARTMENT
<br />OF TRANSPORTATION GENERAL GUIDELINES. DO NOT SCALE DRAWINGS. CALL 811 PRIOR TO DIGGING. ,