My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - SBFD & MLK GESC Proj No 125-008 - CMTA
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Qualifications - SBFD & MLK GESC Proj No 125-008 - CMTA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 4:18:23 PM
Creation date
1/28/2025 11:43:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/28/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a • <br />Breckinridge County Schools • s ," • CMTA <br />Guaranteed Energy Savings Contract ea..* <br />Annual Reconciliation Report (2023-2024) 00 <br />District Summary <br />The following is CMTA's Year 4 Reconciliation Report for Breckinridge County Schools. September 2023 <br />through August 2024 defines the second annual savings period, or Year 4. All energy savings reported <br />herein reflect this 12-month timeframe. <br />The energy savings featured throughout this report originate from the utility bills for the timeframe <br />analyzed and include electrical consumption, electrical demand, fuel consumption, and water <br />consumption. Energy consumed by the facilities associated with this project were compared to the energy <br />usage baselines that are summarized in Section 3, "Energy Baseline Data," of this report. The energy usage <br />difference between the baseline and the actual energy usage for the timeframe analyzed was translated <br />to monetary savings using the rates set forth for each facility as defined in Exhibit F of the guaranteed <br />energy savings contract (GESC). <br />Vpar a <br />Figures 4-1 through 4-3 show the main district facilities' overall performance in Year 4. The orange line <br />represents the district's baseline usage on guaranteed utility accounts, the blue line represents the <br />district's guaranteed usage, and the green line represents the district's actual usage. <br />Note that Hardinsburg Elementary School and Irvington Elementary School are excluded from Figures 4-1 <br />through 4-3. The only ECM performed at HES and IES was Solar PV Array installation. As a result, <br />guaranteed savings are not calculated by comparison to whole -building baselines, but instead they are <br />structured in terms of a guaranteed PV Array production output. <br />Page Content is Subject to Confidentiality Restrictions <br />4-1 <br />9519 Civic Way, Suite 100 1 Prospect, KY 40059 1502.409.4062 1 cmta.com <br />Performance Contracting I MEP Engineering I Zero Energy Engineering I Technology I Commissioning <br />
The URL can be used to link to this page
Your browser does not support the video tag.