My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - SBFD & MLK GESC Proj No 125-008 - CMTA
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Qualifications - SBFD & MLK GESC Proj No 125-008 - CMTA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 4:18:23 PM
Creation date
1/28/2025 11:43:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/28/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EDUCATION <br />Mr. Schweitzer received a Bachelor of Science degree in <br />Mechanical Engineering with a minor in Green Engineering <br />from Virginia Tech University in 2022. <br />REGISTRATIONS <br />• Engineer in Training (EIT) in the Commonwealth of <br />Virginia <br />• LEED (Leadership in Energy and Environmental Design) <br />Accredited Professional BD+C <br />• WELL Accredited Professional (WELL AP) <br />• NABCEP PV Installation Professional <br />RELATED PROJECTS <br />ESPC Project: Total=$15,234,000 <br />Center Grove Community Schools <br />Phase 1- 329 kW roof mounted solar array <br />Phase 2 - 1,331.56 kW ground mounted solar array <br />Phase 3 - 1,625.12 kW roof mounted solar array <br />Greenwood, Indiana <br />ESPC Project: Total=$11,527,219 <br />Fairfax County Government Phase 2 <br />650.36 kW solar PV arrays for 5 facilities <br />Fairfax, Virginia <br />ESPC Project: $12,972,689; 196,347 SF <br />406.43 kW solar PV arrays for 3 facilities <br />Fairfax County Government Phase 3 <br />Fairfax, Virginia <br />ESPC Project: $14,191,257 <br />682.34 kW solar PV arrays for 2 facilities <br />Greenbrier County Schools <br />Lewisburg, West Virginia <br />ESPC Project: Total=$46,743,019 <br />Loudoun County Public Schools Phases 5, 7, 9 <br />Phase 5: 4,600 solar panels, 2,107 kW, installed for 4 <br />schools, and web -based solar dashboard <br />Phase 7: 240.75 kW roof -mounted solar array, 535 modules, <br />for 1 school with energy dashboard and display <br />Phase 9: 1,427.4 kW, 3,172 modules, for 4 schools <br />Ashburn, Virginia <br />90.00 CMTA <br />000 <br />EXPERIENCE <br />Mr. Schweitzer joined CMTA Energy Solutions in June 2022. <br />Prior to employment with CMTA, he was an undergraduate <br />student at Virginia Tech University. <br />While attending university, Mr. Schweitzer worked for a local <br />residential solar installer. During his time in this role, he <br />gained experience designing residential systems from start to <br />finish and installing solar energy systems. <br />As an Engineer with CMTA, Mr. Schweitzer focuses on the <br />design of commercial rooftop solar arrays. His role includes <br />evaluating a site for solar efficacy, generating construction <br />drawings, providing support to construction contractors, and <br />troubleshooting post -construction. <br />As an Owner's Representative, Mr. Schweitzer will ensure <br />the project is designed, built, and commissioned to PV <br />industry standards. He will coordinate and work closely <br />with Owner contacts and contractors to ensure the project <br />is implemented smoothly. Once the project has been <br />completed, Mr. Schweitzer has the expertise to inspect and <br />assist with the commissioning of the PV system if required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.