Laserfiche WebLink
RFQ Response for Guaranteed Energy Savings Contract - � •� • CMTA <br />South Bend Central Fire Station & MILK Dream Center Solar PV *a.-* <br />City of South Bend, Indiana • • 0 <br />5. Cost <br />a. Provide a comprehensive and detailed breakdown of costs for the scope of work described in this document. <br />Include a projected cost per facility based on recently completed projects with similar scope. <br />Based upon our recent solar installation at Center Grove Community Schools in Center Grove, IN, we have estimated the price per <br />wattage for this project, which is found in the table below. The main difference in pricing between the Center Grove project and <br />this project is the prevailing wage requirement and module tariffs. The Center Grove project came in at $2.83/watt for a 70kWdc <br />Emergency Operations Center, which was bid and built in 2024. To be clear, these are ESTIMATED costs at this point. If we are <br />selected as the successful ESCO we will fully design and competitively bid all labor and material to ensure that the City of South <br />Bend gets the most value possible. We will then review those competitive bids directly with the City of South Bend and you will <br />be able to hand select the contractors and material that you want to use as part of this project. <br />$77,421 <br />$134,773 <br />$66,617 <br />$89,850 <br />$14A03 <br />523,960 <br />$21,607 <br />$180,048 - -- <br />$50,914 <br />- $299,497 - <br />Pricing includes: all labor, supervision, administrative technical support, reports, documentation, mileage, and communication expenses, <br />overhead, profit and all items of cost. <br />$1,592 <br />$3,184 <br />We recommend getting extended warranties on the inverters as they are the most likely component to fail over the lifetime of <br />the PV system. <br />Year <br />1 <br />Annual M&V Costs <br />$1,050 <br />Annual O&M Costs <br />$2,250 <br />2 <br />$1,071 <br />$2,295 <br />3 <br />$1,092 <br />$2,341 <br />4 <br />$1,114 <br />$2,388 <br />5 <br />$1,137 <br />$2,435 <br />6 <br />$1,159 <br />$2,484 <br />7 <br />$1,182 <br />$2,534 <br />8 <br />$1,206 <br />$2,585 <br />9 <br />$1,230 <br />$2,636 <br />10 <br />$1,255 <br />$2,689 <br />11 <br />$1,280 <br />$2,743 <br />12 <br />$1,306 <br />$2,798 <br />13 <br />$1,332 <br />$2,854 <br />14 <br />$1,358 <br />$2,911 <br />15 <br />$1,385 <br />$2,969 <br />16 <br />$1,413 <br />$3,028 <br />17 <br />$1,441 <br />$3,089 <br />18 <br />$1,470 <br />$3,151 <br />19 <br />$1,500 <br />$3,214 <br />20 <br />$1,530 <br />$3,278 <br />M&V costs cover the daily monitoring of the PV system to ensure the guarantee is met and stay ahead of system errors. O&M <br />covers the system in its entirety over the 20 year project term and is typically a year to year agreement. <br />Page 17 Page content is proprietary and confidential <br />5 - Cost <br />Performance Contracting I MEP Engineering I Zero Energy Engineering I Technology I Commissioning <br />