My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - SBFD & MLK GESC Proj No 125-008 - Ameresco Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Qualifications - SBFD & MLK GESC Proj No 125-008 - Ameresco Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 4:16:24 PM
Creation date
1/28/2025 11:42:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/28/2025
Text box
ID:
1
Creator:
Created:
1/28/2025 11:43 AM
Modified:
1/28/2025 11:43 AM
Text:
mailto:CraneM@bouldercolorado.gov
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Energy <br />utions <br />�y MERESCO I For Every <br />ry Need <br />J'�'� � For Every Need <br />■ <br />ii. Name, Address, Phone Number <br />of the Owner Representative <br />Michele Crane, Facilities Design & <br />Construction Manager <br />1101 Arapahoe Ave, Boulder, CO <br />(303) 441-4275 <br />CraneM@bouldercolorado.gov <br />N, iii. Firm Responsibility <br />�0' Ameresco designed, developed, <br />implemented, and conducted Measurement <br />& Verification <br />iv. Type of Contract <br />Energy Performance Contract <br />v. Total contract dollar amount <br />and term in years <br />$2,662,859 <br />Term fifteen (15) years <br />vi. Scope of Work 1 Energy Measures <br />Equipment Used <br />Ameresco was commissioned to construct <br />a 1.6 MWdc ground mounted solar PV <br />system at the City of Boulder's 63rd Street <br />Wastewater Treatment Plant. This project <br />presented numerous challenges such as <br />(vi. continued) <br />relocating established wildlife on the property, <br />futureproofing the solar development to account for <br />upcoming expansions of the plant itself., and <br />working within a short construction timeline — the <br />project was completed in less than two months. <br />vii. Sources of project funding <br />Lease <br />viii. Projected and actual project start and <br />end dates; current status <br />Started: February 9, 2018 contract signed <br />Completed: August 21, 2018 <br />Status: completed <br />ix. Projected Annual Utility Savings <br />x. Actual and measured annual <br />City of South Bend, IN I Department of Public Works I RFQ Guaranteed Energy Savings Contract <br />
The URL can be used to link to this page
Your browser does not support the video tag.