Laserfiche WebLink
• Inclement Weather Plan - This plan should include, but is not limited to: <br />u Safety measures that will betaken in the event of a tornado warning, tornado watch, <br />• thunderstorm, and extreme temperatures. <br />If the temperature/windchill drops to dangerous levels we will cancel the march other wise the march will continue. <br />• Proposed Lost and Found Plan - This plan should include, but is not limited to: <br />A description of the use of signage, announcements on public address systems or pre -event <br />handouts. <br />WE do not anticipate the need fro this plan. <br />Section H - Site Plan / Route Mao <br />• For parades, races and other processional events: <br />Are you selecting one of South Bend Police Department's (SBPD) pre -approved race routes? ❑ Yes ® No <br />You must select from SBPD's pre -approved race routes (see links on application site) or provide sufficient <br />evidence of event participation if the applicant is proposing a different route through South Bend. <br />If your event will not be using a pre -approved race route, the proposed event map should include a route plan <br />clearly identifying the timing and locations of proposed street closures, and the direction of parade <br />movement. <br />If your event will not be using a pre -approved race route, please explain <br />This event is a march and not a race. <br />