§ A.2.2 Unless otherwise provided, the Contract Time is the period of time, including authorized adjustments, allotted in <br />the Contract Documents for Substantial Completion of the Work. The Contract Time shall be measured from the date of <br />commencement of the Work. <br />§ A.2.3 Substantial Completion <br />§ A.2.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Construction Manager <br />shall achieve Substantial Completion of the entire Work: <br />(Check one of the following boxes and complete the necessary information) <br />[ ] Not later than ( ) calendar days from the date of commencement of the Work. <br />[ X ] By the following date: March 26, 2026 <br />§ A.2.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are <br />to be completed prior to Substantial Completion of the entire Work, the Construction Manager shall achieve Substantial <br />Completion of such portions by the following dates: <br />No portions of the work are to be completed prior to Substantial Completion of the entire Work. <br />Portion of Work Substantial Completion Date <br />§ A.2.3.3 If the Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3, liquidated <br />damages, if any, shall be assessed as set forth in Section 6.1.6 of the Agreement. <br />ARTICLE A.3 INFORMATION UPON WHICH AMENDMENT IS BASED <br />§ A.3.1 The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the Contract <br />Documents and the following: <br />§ A.3.1.1 The following Supplementary and other Conditions of the Contract: <br />No Supplementary or other Conditions of the Contract are included. <br />Document Title Date Pages <br />§ A.3.1.2 The following Specifications: <br />(Either list the Specifications here, or refer to an exhibit attached to this Amendment) <br />See attached GMP Exhibit 2 — List of Specifications. <br />Section Title Date Pages <br />§ A.3.1.3 The following Drawings: <br />(Either list the Drawings here, or refer to an exhibit attached to this Amendment.) <br />See attached GMP Exhibit 3 — List of Drawings. <br />Number <br />Title Date <br />§ A.3.1.4 The Sustainability Plan, if any: <br />(If the Owner identified a Sustainable Objective in the Owner's Criteria, identify the document or documents that <br />comprise the Sustainability Plan by title, date and number of pages, and include other identi ing information. The <br />Sustainability Plan identifies and describes the Sustainable Objective; the targeted Sustainable Measures; <br />implementation strategies selected to achieve the Sustainable Measures; the Owner's and Construction Manager's roles <br />Init. AIA Document A133 — 2019 Exhibit A. Copyright ©1991, 2003, 2009, and 2019. All rights reserved. "The American Institute of Architects," "American Institute of <br />Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 11:01:03 3 <br />ET on 01/08/2025 under Order No.2114508575 which expires on 02108/2025, is not for resale, is licensed for one-time use only, and may only be used in <br />t accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (1899119974) <br />