My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - WWTP Aeration Area Lighting Proj No 124-067 - K2 Power Solutions, Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotations - WWTP Aeration Area Lighting Proj No 124-067 - K2 Power Solutions, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 4:25:55 PM
Creation date
1/14/2025 12:08:45 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/14/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
that may be necessary in the sole opinion of legal counsel to the City's Board of Public Works to <br />evidence compliance with this provision. The Contractor shall promptly deliver such documents <br />upon the City's request. In the case of such assignment, unless otherwise agreed in writing, The <br />Contractor remains liability to subcontractors for any payment already involved, and for any claim, <br />suit or cause of action based upon or resulting from any error, omission, negligence or other breach <br />of contract by the Contractor, its officers, employees, or agents arising prior to the date of <br />assignment to the City. <br />XIII. LIQUIDATED DAMAGES <br />A. Prevailing Specifications: 2024, INDOT Standard Specifications Section 108 <br />B. Additions: <br />1. The contractor shall proceed with the work at such rate of progress to insure full completion within <br />the Contract Time. It is expressly understood and agreed, by and between the Contractor and the <br />Owner, that the Contract Time for completion of the work described herein is a reasonable time, <br />taking into consideration the average climatic and economic conditions and other factors prevailing <br />in the locality of the work, and excludes the time for unavoidable delays which were beyond the <br />control and without the fault of the Contractor. <br />2. If the Contractor shall fail to complete the work within the Contract Time, or extension of time <br />granted by the Owner, then the Contractor will pay to the Owner the amount for liquidated damages <br />a sum of five hundred dollars ($500.00) for each calendar day that the Contractor shall remain in <br />default after the time of completion stipulated in the Contract Documents. <br />3. The Contractor shall not be charged with liquidated damages or any excess cost when the delay <br />in completion of the work is due to the following and the Contractor has promptly given written <br />notice of such delay to the Owner and Engineer/Architect. <br />a. To any preference, priority, or allocation order duly issued by the Owner. <br />b. To unforeseeable causes beyond the control and without the fault or negligence of the <br />Contractor, including but not restricted to acts of God, acts of public enemy, acts of the Owner, <br />acts of another Contractor in the performance of a Contract with the Owner, fires, floods, <br />epidemics, quarantine restrictions, strikes, freight embargoes, and abnormal and <br />unforeseeable weather. <br />XIV. RETAINAGE AND FINAL PAYMENT <br />A. Prevailing Specifications: 2024, INDOT Standard Specifications Section 109 <br />B. Additions: <br />1. Payments will be made every thirty (30) calendar days <br />2. Consistent with provisions of IC 36-1-12-14, the Board of Public Works shall retain a percentage of <br />payments throughout the duration of the project. <br />3. Before final payment and retainage are released the Contractor must satisfy the following: <br />a. All parts and labor meet requirements stated in the specifications. <br />b. Provide copies of test reports or cut sheets on all materials supplied. <br />c. Provide As -Built drawings in accordance with the City of South Bend Prevailing Specifications <br />for Public Works. <br />d. One (1) copy of the City of South Bend Completion Affidavit and one (1) copy of a Final Waiver <br />of Lien. <br />XV. WARRANTY <br />A. Prevailing Specifications: None <br />B. Additions <br />1. All Parts shall include the following: <br />a. Performance specifications <br />Version 3/15/2024 Page - 4 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.