Laserfiche WebLink
o Sensor data responds to rainfall events and returns to normal conditions after a rainfall event. <br />o Sensor data does not show outliers. <br />• Data uptime reports (including QA/QC) and maintenance reports will be made available <br />to the City monthly. <br />• In addition to the performance guarantee, HydroDigital will have a response time of 24 <br />hours for all critical sites (all CSO and interceptor locations) upon issues of uptime. <br />Fixing the issue will be subject to parts availability if needed to restore the site. <br />• Maintenance includes telemetry and sensor preventative maintenance to ensure high <br />quality data. <br />• Includes battery replacements as required by the site to maintain uptime. <br />• Includes telemetry equipment replacements when damage is due to installation issues. <br />Excludes damage due to City or 3rd party actions, Acts of God (e.g. flooding) or normal <br />wear and tear of the equipment. Equipment not covered by this task and requested by <br />the City will be billed to the City separately. <br />• Site or maintenance visits and activities will be scheduled by HydroDigital based on <br />system performance. Site or maintenance visits requested by the City are not included in <br />this task. <br />• Assumes system calibration as specified in previous quote or similar work is performed <br />to restore the sensor network to operating conditions. <br />Task 2. Data Hosting <br />This task has as objective the hosting of the CSOnet sensor data: <br />• Existing telemetry units will be redirected to send data to the HydroDigital platform with <br />improved functionality and feature set as original CSOnet system (better or equal) <br />including but not limited to: <br />o Ability to visualize time series data from several sensors and Digital Twin <br />o Visualization of forecasted data. <br />o Hosting of Digital Twin (Hydraulic Model). <br />o Comparison of Digital Twin data versus sensor data. <br />o Ability to add maintenance notes to time series data. <br />• The HydroDigital platform will be configured to provide data to the City as currently set <br />up with the original CSOnet or similar. <br />• MRO reports will be included along with the generation of Digital Twin hindcast data to <br />support the reports. <br />Task 3. As Needed <br />This task is a catch all for additional activities related to the CSOnet system as requested by the <br />City and billed as time and materials. Activities that may be requested through this task are: <br />• Installation, removal and relocation of sensors and telemetry units. <br />• Review and modification of control logic. <br />• New equipment required by new site installations or to repair sites due to circumstances <br />excluded in Task 1. <br />• Additional site or maintenance visits not covered by Task 1.