My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote- Studebaker Museum HVAC Replacement Proj 124-020 - Herrman & Goetz
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Award Quotations & Proposals
>
Award Quote- Studebaker Museum HVAC Replacement Proj 124-020 - Herrman & Goetz
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 9:35:36 AM
Creation date
12/17/2024 1:09:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
04[iTFr g <br />O <br />CITY OF SOUTH BEND, INDIANA " "- <br />�, rrAee 1 Y <br />CONTRACTOR'S QUOTE FOR PUBLIC WORK J <br />PROJECT NAME: <br />PROJECT NO. <br />QUOTES DUE <br />Studebaker Museum HVAC Replacement <br />124-020 <br />November 26. 2024 at 9:00 am EDT <br />(Must be completed for all quotes. Please type or print) <br />Date: j) _ 2 S - 2J Z L1 Firm: J�t.tZfLM o A + (-V 4,0_[ Z <br />Address: 4•` w' e— Si. t-lI sy 0"W'_ � _ --rw L4 & <br />City/State/Zip: Telephone Number: (57LI ) Z FSZ - Z 57 (i <br />Email Address: Vh � ✓, h 1 5e P V i ce-5- (-Om <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public orks project of: <br />Sly IAlr:cJ, %05C,,rw N'J%L t2,c..-PIczvc0,,e V �{�� 17_�I—C?2D <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, Department of Public Works <br />and dated ,J j ^ Z rj - 2a2 for the sum of (enter the Total Quote as shown on the Proposal) <br />tt o� <br />$`�� �Ja <br />nter Sum of Total Quote plus Alternates shown on Proposal)(Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. if the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />ACCEPTANCE <br />The above quote is accepted this I day of <br />Subject to the following conditions: <br />Version 3/15/2024 <br />CITY OF SOUTH BEND, INDIANA <br />BOARD OF PUBLIC WORKS <br />V'a(4 <br />Elizabeth A. Maradik, President <br />Gary A. Gilot, Member <br />yru11—, <br />(Signature) <br />ll <br />(Printed Name of Person Signing) <br />Joseph R. Molnar, Vice President <br />Briana�Miicou, Member <br />20 <br />Public Works Quote <br />Murray L. Miller, Member <br />Attest: Theresa M. Heffner, Clerk <br />Date: December 17, 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.