Laserfiche WebLink
Scopes of Work and Responsibilities <br />CRG Residential <br />GENERAL CONDITIONS <br />1. Pre -Construction Services. <br />2. Project Management Services provided as required. <br />3. Project Accountant Services provided. <br />4. Project Administrative Assistant provided. <br />S. Project Engineer Services provided as required. <br />6. Project Supervision Services provided as required. <br />7. On -Site Technology for Construction Operations. <br />8. General Liability Insurance. <br />9. Building Permit Fees excluded. <br />10. Field Offices and Storage (Connex Boxes) provided. <br />11. Safety Inspections by Independent Firm provided. <br />12. Field Sanitary Facilities provided. <br />13. Field Water Services provided. <br />14. Field Electric Services provided. <br />15. Temporary Lighting for the buildings during construction. <br />16. Field Surveying upon property corner staking by Owner. <br />17. Field Testing Services provided for subsurface and above grade. <br />18. Traffic Control provided. <br />19. Temporary Roads provided. <br />20. Barricades and Temporary Fencing provided. <br />21. Project Construction Safety Signage provided. <br />22. Continuous Construction Cleaning provided, no FFE provisions. <br />23. Dumpster/Rubbish Removal provided during construction, no FFE provisions. <br />24. Final Cleaning provided. <br />CRG general conditions typically range from 5-6% on a project of this size. <br />'000■ <br />CM <br />RESIDENTIAL <br />