My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Olive WTP Solar GESC Proj No 124-050 - Ameresco Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - Olive WTP Solar GESC Proj No 124-050 - Ameresco Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 2:26:56 PM
Creation date
12/11/2024 11:29:04 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AMERESC0 <br />Green • Glean • Sustainable `� <br />Executive Summary <br />This Measurement and Verification (M&V) Report summarizes the Energy Cost, Operational Cost, and <br />Capital Cost Avoidance Savings achieved from the Energy Conservation Measures (ECMs) installed at The <br />City of South Bend, Century Center. The ECMs were implemented in 2015 and 2016 under the Energy <br />Services Agreement (ESA), effective April 28th, 2015 in the amount of $4,855,897. An Amendment to the <br />ESA was executed on December 22"d, 2015 that added a solar photovoltaic system to the project. As a <br />result, the final contract amount was $4,926,784. This is the eighth annual M&V Report that covers year <br />eight of the fifteen -year Guarantee Period that started on the date of final acceptance: October 1ST, 2016. <br />Ameresco guaranteed that the City of South Bend would save $527,608 during year eight of the Guarantee <br />Period. This total Guaranteed Savings amount consists of $103,242 in Energy Savings, $7,466 in <br />Operational Savings, and $416,899 in Capital Cost Avoidance Savings. The Guaranteed Savings are <br />assessed on an annual basis and are comprised of several ECMs that were implemented in the facility. The <br />following table summarizes the individual ECMs implemented and the amount of savings projected for <br />each ECM during year eight of the Guarantee Period. <br />aYear Eight Guaranteed Savings <br />FW_ ECIVI <br />ECM 1— Roofing Replacement <br />Energy Savings <br />$2,021 <br />ECM 2 — Lighting Replacement <br />$25,569 <br />ECM 3 — Lighting II — Upgrades <br />$15,735 <br />ECM 4 — HVAC System Upgrades <br />$57,782 <br />ECM 5 — HVAC Control System Upgrades <br />Included in ECM 4 <br />ECM 6 — Ceiling Tile Replacement and Upgrades <br />$0 <br />ECM 7 — Install Solar PV <br />$2,135 <br />Energy Savings Total <br />Operational Savings <br />$7,466 <br />Capital Cost Avoidance Savings <br />$416,899 <br />Total Guaranteed Savings <br />October 15th, 2024 <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.