My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Olive WTP Solar GESC Proj No 124-050 - Ameresco Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - Olive WTP Solar GESC Proj No 124-050 - Ameresco Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 2:26:56 PM
Creation date
12/11/2024 11:29:04 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Flagstaff <br />Phase 3 Solar Photovoltaic Energy Savings Report: Year 10 AMERESCO <br />4. <br />1.0 Report Summary <br />1.1 Report Period <br />This report includes measurement and verification (M&V) data for City of Flagstaff (City) Phase <br />3 Solar Photovoltaic (PV) Project in Flagstaff, Arizona, during Year 10 of the reporting period. <br />1-9 Contract Year <br />This report includes the Year 10 savings for the City as determined by the M&V process. Year <br />10 includes the period of February 1, 2023 through January 31, 2024. <br />1.3 Project Summary <br />The City contracted with Ameresco, Inc. (Ameresco) to develop a PV solar system to provide <br />onsite generated power interconnected with the Arizona Public Service (APS) electrical grid. <br />The table below lists the site and meters associated with this project as well as each site's <br />substantially complete date. <br />Table 1.0. Site Information <br />Aquaplex CT6040 10/31 /2013 <br />Rio de Flag Q80673 12/19/2013 <br />Sun Bear (Wildcat) P23190 12/19/2013 <br />All three sites were finalized in January 2014 and the first guaranteed production period began <br />on the first day of February 2014. <br />1.4 Adjustment <br />An Availability Adjustment was not performed due to the overall production surplus observed <br />across all sites. The surplus production from Aquaplex effectively compensates for the <br />production losses that occurred at the other two sites. <br />Measurement and Verification Ocici,; ')02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.