My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Olive WTP Solar GESC Proj No 124-050 - Ameresco Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - Olive WTP Solar GESC Proj No 124-050 - Ameresco Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 2:26:56 PM
Creation date
12/11/2024 11:29:04 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Inclusions/Exclusions: <br />Ameresco has based the pricing in its proposal on the following. We look forward to discussing <br />these in detail with you. <br />Assumptions and Clarifications <br />• There are no underground utilities in the area of the array <br />• Building 1A or 1 B will be the point of interconnection <br />• Work will be performed Monday through Friday 6:30am-2:30pm. <br />• In order to interconnect the solar PV systems, a temporary utility power interruption is <br />typically required. Interconnection typically takes no more than 4-6 hours and will be <br />coordinated well in advance with the City and Department of Public Works to minimize <br />any possible disruption. The work can be performed during weekend hours if desired. <br />• Pricing is good for 45 days. Commodities such as PV modules, copper, aluminum, steel, <br />etc. that change at the time of procurement may affect pricing. <br />Inclusions: <br />• Chain link fence compliant with NEC requirements <br />• Payment and performance bonds <br />• Completing all construction activity in a workmanlike manner <br />• Following manufacturer's written instructions for all equipment and material installation <br />• All required engineering to obtain jurisdictional permits <br />• Design conforms to jurisdictional and utility interconnection requirements <br />• Construction safety precautions in compliance with Ameresco and OSHA safety <br />standards <br />• 1 year workmanship warranty <br />• 5 year subscription for data acquisition system <br />• Landscaping repair to return disturbed areas to the condition they were in before project <br />commencement. <br />Exclusions: <br />• Union labor and/or prevailing wage rates <br />• Apprentices Labor <br />• Tariffs imposed after the date of contract execution <br />• Module level rapid shutdown is not required or included. <br />• Lighting or security cameras <br />• Domestic content per the ITC definition <br />• Utility service upgrades or other electrical infrastructure upgrades including harmonic <br />distortion remediation <br />• Excludes lightning protection system design, modification and/or installation. <br />City of South Bend, IN I Department of Public Works I RFQ Guaranteed Energy Savings Contract <br />
The URL can be used to link to this page
Your browser does not support the video tag.