My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Olive WTP Solar GESC Proj No 124-050 - Veregy
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - Olive WTP Solar GESC Proj No 124-050 - Veregy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 2:40:36 PM
Creation date
12/11/2024 11:27:52 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend, IN — Department of Public Works J"L VER EGYV <br />RFQ Response: Guaranteed Energy Savings Contract 104r <br />Project Management Approach <br />Veregy Project Managers (PM) are active in the project from its conception. They work with <br />project developers through the audit and design phase, and then after the project is approved, <br />they take control through the implementation and the entire warranty period. Veregy project <br />managers are field-tested professionals with engineering and business backgrounds with the <br />industry knowledge to be involved in every project phase. Veregy promotes an interactive <br />working relationship with our clients. We will work with the City of South Bend to integrate our <br />staff of professionals with the city's team of personnel and subcontractors so that every aspect <br />of the project is successfully coordinated. <br />Scope Review <br />Constructability Review Procurement, Bidding <br />and Estimating <br />Permitting and Code <br />Review <br />Preliminary Schedule <br />Review <br />Subcontractor <br />Selection <br />Equipment Selection <br />Schedule Review <br />Final Schedule Review <br />Establish Formal <br />Communication Lines <br />Subcontractor <br />Procurement and <br />Scheduling <br />I Material Ordering <br />CONTRACTOR & EQUIPMENT SELECTION <br />Staging I!� <br />Communication <br />Superintendent & <br />Safety On Site <br />Utilize PM Software <br />O&M and Training <br />Contractor Selection <br />Veregy provides over $200 million annually in guaranteed energy projects, contractor services <br />and energy services. With this volume of work, we have developed solid, fiscally responsible <br />standard practices and methods to select contractors. Some of the things that we analyze when <br />selecting a contractor are: <br />• Financial stability • Safety record <br />• Available capacity for project • Similar attitudes toward quality <br />• Historical project performance • Legal history <br />• Proximity to project <br />Equipment Selection <br />Equipment selection follows a similar process as contractor selection. With over $200 million <br />dollars in annual projects, Veregy has the buying power to assure the best pricing on all <br />equipment. Some of the things that we analyze when selecting equipment are: <br />Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.