Laserfiche WebLink
C1ty of 5c,u* WTP Tue 1/14/25 Wed s/26/26 <br />Olive Street <br />■ Administration <br />Tr,N 1/14/25 <br />Fri 5/23/25 <br />Project Award <br />Tue 1/14/25 <br />Tue 1/14/25 <br />Internally Turn -fir <br />Morn 1/27/25 <br />Mon 1/27/25 <br />Procurment <br />Tue 1/28125 <br />Fri 1/31/25 <br />Customer rick -Off <br />Fri 2/7/25 <br />Fri 2/7/25 <br />Meeting <br />Permitting and <br />Mon 4114/25 <br />Fri 5123/25 <br />interconnection <br />• En glneerin C <br />Moir 2/3/23 <br />Fri 4/11/25 <br />Geotechrikal <br />Mon 2/3/25 <br />Fri 2129125 <br />Surveying <br />Mon 213125 <br />Fri 2121/25 <br />Racking Engineering <br />Mon 3/3/25 <br />Fri 4/11/25 <br />Electrical Engineering <br />Mon 213125 <br />Fri 3/2$/25 <br />• Corsstructlan <br />Fri 5/23/25 <br />Wed 9/3fZ5 <br />Contractor <br />Fri 5/23125 <br />Fri 5/23/25 <br />Mobilization <br />Ground Mount <br />Mon 5126/25 <br />Tue 5/27/25 <br />Staking <br />Pile Installation <br />Wed 5/28,/25 <br />Tue 6110/25 <br />Racking and Module <br />Wed 6111/25 <br />Tue 7/15/25 <br />Installation <br />AC. Underground <br />Wed 5/28/25 <br />Tue 7/15/25 <br />installation <br />DC Electrical <br />Wed 7/16125 <br />Tue 8/2 612 5 <br />installation <br />Interconnection <br />Wed 7/16/25 <br />Tue 7/29125 <br />Solar Commissioning <br />Wed 8127/25 <br />Tue 9/2/25 <br />PTO <br />Wed 8127/25 <br />Tue 9/2/25 <br />Owners Training; <br />Wed 9/3/25 <br />Wed 9/3/25 <br />• Servioe <br />Wed 2/14/26 W ed 8/26/26 l� <br />11st) Bi-Annual <br />Wed 1/14/26 Wed 1/14/26 � <br />(Znd) Bi•Annual <br />Thu 7/2J26 Thu 7/2/26 <br />M&V Report <br />Wed 8/26/26 Wed 8/26/26 <br />