Laserfiche WebLink
Life IS On chili der <br />i Electric <br />Non -Measured Savings <br />The following section was included in an earlier report. It is reprinted here for consistency and to provide a full <br />picture of Year 1 savings. <br />In addition to the measured savings, the energy performance contract had the following non -measured <br />financial impact. <br />Utility Cost Savings <br />WW Plant - Seal Building Envelope Air Leaks <br />$1,334 <br />City Hall - Seal Building Envelope Air Leaks <br />$157 <br />East Plant - Seal Building Envelope Air Leaks <br />$65 <br />Fire Station 1- Seal Building Envelope Air Leaks <br />$251 <br />Fire Station 2- Seal Building Envelope Air Leaks <br />$670 <br />Park Admin - Seal Building Envelope Air Leaks <br />$640 <br />Police Station - Seal Building Envelope Air Leaks <br />$668 <br />Transit Building- Seal Building Envelope Air Leaks <br />$466 <br />Beechwood Clubhouse - Seal Building Envelope Air Leaks <br />$37 <br />Civic Center- Seal Building Envelope Air Leaks <br />$424 <br />Lake St Station - Seal Building Envelope Air Leaks <br />$297 <br />Fire Station 3- Seal Building Envelope Air Leaks <br />$218 <br />City Hall - Install Window Films <br />$230 <br />Beechwood Clubhouse - Install Window Films <br />$27 <br />Total <br />$5,483 <br />Operation and Maintenance Savi <br />Water Meter O&M Savings $72,811 <br />Lighting Retrofit O&M Savings $5,583 <br />Total $78,394 <br />