Laserfiche WebLink
Post-Im lementation Measurements and Documentation <br />No Post -Implementation Period measurements are required. All post -project measurements will be <br />performed during the Performance Period. <br />Performance Period Measurements and Documentation <br />Fi (Performance Period accuracy of water meter in flow category j) will be determined by taking samples <br />of the accuracy of the post -project water meters. This will be completed at least 12 months after the Date <br />of Commencement of this Contract. Accuracy will be computed by dividing measured consumption by the <br />actual water flow during a short-term test. These tests may be performed at the meter location or at a <br />remote testing facility. The average accuracy percentage for each class will be used as the appropriate Fi <br />figure for each meter. The table below shows the minimum sample sizes for each post -project meter class <br />and will be used to record the results of the measurements. There may be different numbers of pre- and <br />post -project meter classes. ESCO may elect to perform additional measurements beyond the sample size <br />minimums for use in determining the Fj values. The minimum sample size for each meter class will be the <br />smaller of 10 meters and 1 % of the new population of the meter class. <br />Minimum <br />Sample Size I Flow <br />Post Meter Class 1 <br />Post Meter Class 2 <br />Post Meter Class ... <br />Post Meter Class Z <br />D. Parameter Estimates <br />Performance Period Meter Accuracy Percentage (F) <br />Flow CateqoDl 2 Flow Cate o Flow Category K <br />Of the parameters identified under the equations for water savings in Section B, only P/ (percent of water <br />consumption for flow rate category j) will be estimated. Each water meter will be assigned flow rate by <br />meter size. The table below defines the estimated Pi values for each meter size. <br />Percents <br />a of Water Con sum Dtion f P <br />Catego <br />Max. Flow <br />Int. Flow <br />Min. Flow <br />5/8' or 3W <br />7% <br />78% <br />15% <br />All Others <br />20% <br />70% <br />10% <br />E. Cost Savings Calculations <br />Provided below are the methods and equations used to determine the cost savings associated with this <br />particular methodology. <br />Cost Savings are calculated as the difference between the baseline and Performance Period <br />energy/water costs using the utility rates as defined above in Schedule D: Water/Sewer Water Rate Data. <br />Water rates will escalate at 3% annually; sewer rates will escalate at 5% annually. The applicable water <br />rates will be applied to the baseline and Performance Period water consumption as determined in <br />Paragraph B for each meter. <br />OPTION B — SOLAR PHOTOVOLTAIC <br />A. Overview of M&V Plan, and Savings Calculation <br />B. Energy Savings Calculations <br />C. Parameter Measurement Strategy <br />D. Cost Savings Calculations <br />A. Overview of M&V Plan, and Savings Calculation <br />Savings in this section are determined by using an "Option B: Retrofit Isolation — All Parameter <br />Measurement" approach as described in the International Performance Measurement & Verification <br />Energy Solutions Proprietary and Confidential <br />v102811 26 <br />